| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0029-002 | BOILERMAKER | $50.62 | $28.82 |
| BRMA0003-021 | BRICKLAYER, CEMENT MASON, PLASTERER(NEW BEDFORD CHAPTER) | $64.50 | $37.54 |
| CARP0723-004 | CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENTALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (DUKES COUNTY) | $26.55 | $13.02 |
| CARP0723-004 | CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENTWOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (DUKES COUNTY) | $26.55 | $13.02 |
| CARP0723-005 | CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENTALL OTHER CARPENTRY WORK ON WOOD FRAME PROJECTS (NANTUCKET COUNTY) | $26.55 | $13.02 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARP0723-005 | CARPENTER, NEW WOOD FRAME CONSTRUCTION NOT EXCEEDING 4 STORIES INCLUDING BASEMENTWOOD FRAMING, SIDING AND EXTERIOR TRIM WORK (NANTUCKET COUNTY) | $26.55 | $13.02 |
| CARP0346-004 | CARPENTERS(ALL OTHER WORK) | $50.10 | $31.45 |
| ELEC0223-009 | ELECTRICIAN | $50.02 | $31.05 |
| ELEV0004-001 | ELEVATOR MECHANIC FOOTNOTE FOR ELEVATOR MECHANICSA.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $74.17 | $38.44 |
| CARP2168-009 | FLOOR LAYERCARPET | $49.18 | $31.75 |
| PAIN0011-009 | GLAZIER FOOTNOTEA. PAID HOLIDAY: LABOR DAY, PROVIDED EMPLOYEE HAS WORKED ANY PART OF THE WEEK PRIOR TO LABOR DAY AND PART OF THE WEEK AFTER LABOR DAY | $43.13 | $21.00 |
| IRON0037-006 | IRONWORKER | $43.03 | $33.53 |
| LABO0022-011 | LABORERSGROUP 7 FLAGGERS | $27.01 | $29.70 |
| LABO0022-011 | LABORERSGROUP 6 ASBESTOS REMOVAL LABORERS | $46.10 | $29.70 |
| LABO0022-011 | LABORERSGROUP 5 PRE-CAST FLOOR AND ROOF PLANK ERECTOR | $38.95 | $29.70 |
| LABO0022-011 | LABORERSGROUP 4 BLASTER; POWDERMAN | $38.95 | $29.70 |
| LABO0022-011 | LABORERSGROUP 3 AIR TRACK, BLOCK PAVER; RUMMER; CURB SETTER; HYDRAULIC AND SIMILAR SELF POWERED DRILLS | $38.95 | $29.70 |
| LABO0022-011 | LABORERSGROUP 2 JACKHAMMER OPERATOR; PAVEMENT BREAKER; ASPHAL RAKER CARBIDE CORE DRILLING MACHINE; CHAIN SAW OPERTOR; PIPELAYER; BARCO TYPE JUMPING TAMPERS; LASER BEAM; CONCRETE PUMP; MASON TENDER; MOTORIZED MORTAR MIXER; RIDE-ON MOTORIZED BUGGY; FENCE AND BEAM RAIL ERECTOR | $38.95 | $29.70 |
| LABO0022-011 | LABORERSGROUP 1 LABORERS; CARPENTER TENDERS | $38.95 | $29.70 |
| LABO1421-005 | LABORERS, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY) | $42.25 | $29.70 |
| LABO1421-005 | LABORERS, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER | $46.25 | $29.70 |
| LABO1421-005 | LABORERS, WRECKING: GROUP 2 BURNERS, JACKHAMMERS | $47.00 | $29.70 |
| LABO1421-005 | LABORERS, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS | $47.25 | $29.70 |
| LABO1421-005 | LABORERS, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS | $45.35 | $29.70 |
| LABO1421-005 | LABORERS, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE | $46.25 | $29.70 |
| BRMA0003-001 | MARBLE & TILE FINISHER | $49.32 | $35.26 |
| BRMA0003-001 | MARBLE, TILE & TERRAZZO WORKERS | $64.52 | $37.51 |
| PAIN0035-024 | PAINTERSBRUSH, TAPER (REPAINT) | $44.32 | $36.00 |
| PAIN0035-024 | PAINTERSSPRAY, SANDBLAST (NEW CONSTRUCTION) | $47.66 | $36.00 |
| PAIN0035-024 | PAINTERSSPRAY, SANDBLAST (REPAINT) | $45.72 | $36.00 |
| PAIN0035-024 | PAINTERSBRUSH, TAPER (NEW CONSTRUCTION) | $46.26 | $36.00 |
| PLUM0051-007 | PLUMBERS AND PIPEFITTERS | $52.49 | $33.60 |
| ENGI0004-010 | POWER EQUIPMENT OPERATORSGROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINE (1-3 GROUPED); GENERATOR; CONCRETE VIBRATOR; HEATER (POWER DRIVEN 1- 5); WELL POINT SYSTEM (OPERATING); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR OR STEAM; CONVEYOR; JACKSON TYPE TAMPER; SINGLE DIAPHRAGM PUMP; LIGHTING PLANT FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, TH | $37.02 | $33.70 |
| ENGI0004-010 | POWER EQUIPMENT OPERATORSOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $57.18 | $33.70 |
| ENGI0004-010 | POWER EQUIPMENT OPERATORSGROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $30.85 | $33.70 |
| ENGI0004-010 | POWER EQUIPMENT OPERATORSGROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $25.02 | $33.70 |
| ENGI0004-010 | POWER EQUIPMENT OPERATORSGROUP 4 ASSISTANT ENGINEER (FIREMAN) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $46.52 | $33.70 |
| ENGI0004-010 | POWER EQUIPMENT OPERATORSGROUP 1 CRANE; SHOVEL; TRUCK CRANE; CHERRY PICKER; DRAGLINE; TRENCH HOE; BACKHOE; THREE DRUM MACHINE; DERRICK; PILE DRIVER; ELEVATOR TOWER; HOIST; GRADALL; SHOVEL DOZER; FRONT END LOADER; FORK LIFT; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; POST HOLE DIGGER; PUMPCRETE MACHINE; ASPHALT PLANT (ON SITE); CONCRETE BATCHING AND/OR MIXING PLANT (ON SITE); CRUSHER PLANT (ON SITE); PAVING CONCRETE MIXER; TIMBER JACK FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGT | $57.83 | $33.70 |
| ROOF0033-001 | ROOFERS(ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL AREAS OF ANY TYPE WHERE A ROOF IS TO BE RELAID) | $53.53 | $35.69 |
| SFMA0669-003 | SPRINKLER FITTER(BARNSTABLE; BRISTOL (BEYOND 35 MI RADIUS OF BOSTON CITY HALL); DUKES; MIDDLESEX (ASHBY, TOWNSEND, THE AREA OF PEPPERELL AND SHIRLEY BEYOND 35 MI RADIUS OF BOSTON CITY HALL); NANTUCKET; PLYMOUTH (BEYOND 35 MI RADIUS OF BOSTON CITY HALL)) | $49.70 | $29.75 |
| SFMA0669-004 | SPRINKLER FITTER | $49.70 | $29.75 |
| BRMA0003-001 | TERRAZZO FINISHER | $63.44 | $37.33 |
| TEAM0379-001 | TRUCK DRIVERSGROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VA | $41.53 | $37.35 |
| TEAM0379-001 | TRUCK DRIVERSGROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID V | $41.24 | $37.35 |
| TEAM0379-001 | TRUCK DRIVERSGROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YE | $41.14 | $37.35 |
| TEAM0379-001 | TRUCK DRIVERSGROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - | $41.02 | $37.35 |
| TEAM0379-001 | TRUCK DRIVERSGROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VA | $40.78 | $37.35 |
| TEAM0379-001 | TRUCK DRIVERSGROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION F | $40.95 | $37.35 |
| TEAM0379-001 | TRUCK DRIVERSGROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEE | $41.82 | $37.35 |