Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Massachusetts: Worcester. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0029-001 | BOILERMAKER | $50.62 | $28.82 |
| BRMA0001-014 | BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON(WORCESTER CHAPTER WORCESTER (AUBURN BARRE, BLACKSTONE, BERLIN, BOLTON, BOYLSTON, THE BROOKFIELDS, CHARLTON, CLINTON, DOUGLAS, DUDLEY, GRAFTON, HARDWICK, HOLDEN, LEICESTER, MENDON, MILLBURY, MILVILLE, NEW BRAINTREE, NORTHBORO, NORTHBRIDGE, OAKHAM, OXFORD, PAXTON, RUTLAND, SHREWBURY, SOUTHBRIDGE, SPENCER, STURBRIDGE, SUTTON, UPTON, UXBRIDGE, WEBSTER, WESTBORO, WEST BOYLSTON, WORCESTER)) | $60.26 | $33.71 |
| BRMA0001-015 | BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON(LOWELL CHAPTER WORCESTER (HOPEDALE, MILFORD, SOUTHBORO)) | $60.26 | $33.71 |
| BRMA0001-023 | BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON(LOWELL CHAPTER WORCESTER (ASHBURHANM, ATHOL, FITCHBURG, GARDNER, HARVARD, HUBBARDSTON, LANCASTER, LEOMINSTER, LUNENBURG, PETERSHAM, PHILLIPSTON, PRINCETON, ROYALSTON, STERLING, TEMPLETON, WESTMINSTER, WINCHENDON)) | $60.26 | $33.71 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| BRMA0001-002 | BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON(SPRINGFIELD/PITTSFIELD CHAPTER WORCESTER (WARREN COUNTY)) | $50.81 | $32.27 |
| CARP0336-002 | CARPENTER/LATHER(WORCESTER (EXCEPT GILBERTVILLE, HARWICK, WARREN, WEST BROOKFIELD)) | $50.10 | $31.45 |
| CARP0336-007 | CARPENTER/LATHER(WORCESTER (GILBERTVILLE, HARDWICK, WARREN, WEST BROOKFIELD)) | $50.10 | $31.45 |
| CARP0056-004 | DIVER | $78.11 | $35.47 |
| CARP0056-004 | DIVER TENDER | $61.70 | $35.47 |
| ELEC0096-002 | ELECTRICIAN(WORCESTER (WARREN)) | $48.16 | $36.20 |
| ELEV0041-002 | ELEVATOR MECHANIC FOOTNOTEA.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $66.41 | $38.44 |
| PAIN0035-021 | GLAZIER | $46.26 | $36.00 |
| ASBE0006-005 | INSULATOR/ASBESTOS WORKER(INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATING, AND FINISHES ALL TYPES OF MECHANICAL SYSTEMS) | $49.10 | $36.63 |
| IRON0007-012 | IRONWORKER | $57.57 | $37.67 |
| LABO0022-001 | LABORERS, HEAVY CONSTRUCTION: GROUP 2 ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILL OPERATOR, JACK HAMMER OPERATOR, PAVEMENT BREAKER, CARBIDE CORE DRILLING MACHINE, CHAIN SAW OPERATOR, BARCO TYPE JUMPING TAMPERS, CONCRETE PUMP, MOTORIZED MORTAR MIXER, RIDE-ON-MOTORIZED BUGGY | $39.20 | $29.70 |
| LABO0022-001 | LABORERS, HEAVY CONSTRUCTION: GROUP 5 FLAGGER | $39.70 | $29.70 |
| LABO0022-001 | LABORERS, HEAVY CONSTRUCTION: GROUP 6 ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS | $40.95 | $29.70 |
| LABO0022-001 | LABORERS, HEAVY CONSTRUCTION: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF POWERED DRILLS | $39.70 | $29.70 |
| LABO0022-001 | LABORERS, HEAVY CONSTRUCTION: GROUP 4 BLASTER; POWDERMAN | $39.95 | $29.70 |
| LABO0022-001 | LABORERS, HEAVY CONSTRUCTION: GROUP 1 LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS, PLASTERER TENDERS | $38.95 | $29.70 |
| LABO0022-013 | LABORERSGROUP 5 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $47.48 | $29.70 |
| LABO0022-013 | LABORERSGROUP 4 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $45.48 | $29.70 |
| LABO0022-013 | LABORERSGROUP 3 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 |
| LABO0022-013 | LABORERSGROUP 2 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 |
| LABO0022-013 | LABORERSGROUP 2 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $45.48 | $29.70 |
| LABO0022-013 | LABORERSGROUP 2 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR)) | $50.50 | $29.70 |
| LABO0022-013 | LABORERSGROUP 2 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | $45.48 | $29.70 |
| LABO0022-013 | LABORERSGROUP 1 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $42.93 | $29.70 |
| LABO0022-013 | LABORERSGROUP 1 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $42.93 | $29.70 |
| LABO0022-013 | LABORERSGROUP 1 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR)) | $50.50 | $29.70 |
| LABO0022-013 | LABORERSGROUP 1 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | $45.48 | $29.70 |
| LABO0022-013 | LABORERSDRILLER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $42.58 | $29.70 |
| LABO0022-013 | LABORERSBOTTOM MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $42.33 | $29.70 |
| LABO0022-013 | LABORERSGROUP 3 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $45.48 | $29.70 |
| LABO0022-013 | LABORERS(TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR), GROUP 6 HAZARDOUS WASTE WORK WITHIN THE ""HOT"" ZONE. (A PREMIUM OF TWO DOLLARS $2.00 PER HOUR OVER THE BASIC WAGE RATE. FOOTNOTE FOR LABORERS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, PATRIOT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $ 58.43 29.70 LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $41.18 | $29.70 |
| LABO0022-013 | LABORERSLABORERS; TOP MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $46.20 | $29.70 |
| LABO0022-013 | LABORERSLABORER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $41.18 | $29.70 |
| LABO0022-013 | LABORERSGROUP 5 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 |
| LABO0022-013 | LABORERSGROUP 4 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 |
| LABO1421-003 | LABORERS, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY) | $42.25 | $29.70 |
| LABO1421-003 | LABORERS, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE | $46.25 | $29.70 |
| LABO1421-003 | LABORERS, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS | $45.35 | $29.70 |
| LABO1421-003 | LABORERS, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS | $47.25 | $29.70 |
| LABO1421-003 | LABORERS, WRECKING: GROUP 2 BURNERS, JACKHAMMERS | $47.00 | $29.70 |
| LABO1421-003 | LABORERS, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER | $46.25 | $29.70 |
| ELEC0104-001 | LINE CONSTRUCTIONLINEMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $58.41 | $30.19 |
| ELEC0104-001 | LINE CONSTRUCTIONCABLEMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $58.41 | $30.19 |
| ELEC0104-001 | LINE CONSTRUCTIONEQUIPMENT OPERATOR A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $49.65 | $26.72 |
| ELEC0104-001 | LINE CONSTRUCTIONGROUNDMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $32.13 | $12.70 |
| BRMA0003-001 | MARBLE & TILE FINISHER | $49.32 | $35.26 |
| BRMA0003-001 | MARBLE, TILE & TERRAZZO WORKERS | $64.52 | $37.51 |
| CARP1121-004 | MILLWRIGHT | $43.42 | $33.00 |
| LABO0022-013 | ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $41.18 | $29.70 |
| PAIN0035-006 | PAINTERBRUSH, TAPER (NEW CONSTRUCTION) | $46.26 | $36.00 |
| PAIN0035-006 | PAINTERSPRAY, SANDBLAST (NEW CONSTRUCTION) | $47.66 | $36.00 |
| PAIN0035-006 | PAINTERBRIDGE (NEW CONSTRUCTION) | $56.76 | $36.00 |
| PAIN0035-006 | PAINTERBRIDGE (REPAINT) | $44.32 | $36.00 |
| PAIN0035-006 | PAINTERSPRAY, SANDBLAST (REPAINT) | $45.72 | $36.00 |
| PAIN0035-006 | PAINTERBRUSH, TAPER (REPAINT) | $44.32 | $36.00 |
| CARP0056-008 | PILEDRIVERMAN | $49.19 | $35.47 |
| PLUM0012-002 | PLUMBER(WORCESTER (HOPEDALE AND SOUTHBORO)) | $69.84 | $36.43 |
| PLUM0004-002 | PLUMBERS AND PIPEFITTERS(WORCESTER (EXCEPT HOPEDALE AND SOUTHBORO)) | $55.00 | $31.57 |
| ENGI0004-003 | POWER EQUIPMENT OPERATORS(BUIDING, HEAVY & MARINE): GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HO | $30.85 | $33.70 |
| ENGI0004-003 | POWER EQUIPMENT OPERATORS(BUIDING, HEAVY & MARINE): GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMA | $25.02 | $33.70 |
| ENGI0004-003 | POWER EQUIPMENT OPERATORSGROUP 4 ASSITANT ENGINEER (FIREMAN) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLU | $46.52 | $33.70 |
| ENGI0004-003 | POWER EQUIPMENT OPERATORS(BUIDING, HEAVY & MARINE): GROUP 1 POWER SHOVEL; CRANE; TRUCK CRANE; DERRICK; PILE DRIVER; TRENCHING MACHINE; MECHANICAL HOIST PAVEMENT BREAKER; CEMENT CONCRETE PAVER; DRAGLINE; HOISTING ENGINE; THREE DRUM MACHINE; PUMPCRETE MACHINE; LOADERS; SHOVEL DOZER; FRONT END LOADER; MUCKING MACHINE; SHAFT HOIST; STEAM ENGINE; BACKHOE; GRADALL; CABLE WAY; FORK LIFT; CHERRY PICKER; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; PORT HOLE DIGGER; ASPHALT PLANT ON JOB SITE; CONCRETE BATCHING AND/OR MIXING P | $57.83 | $33.70 |
| ENGI0004-003 | POWER EQUIPMENT OPERATORS(BUIDING, HEAVY & MARINE): GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINES (1-3 GROUPED); GENERATOR; SIGHTING PLANT; HEATERS (POWER DRIVEN, 1- 5); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR STEAM, CONVEYOR, WELLPOINT SYSTEM (OPERATING) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE FOR | $37.02 | $33.70 |
| ENGI0004-003 | POWER EQUIPMENT OPERATORSGROUP 2 SONIC OR VIBRATORY HAMMER; GRADER; SCRAPER; TANDEM SCRAPER; BULLDOZER; TRACTOR; MECHANIC - MAINTENANCE; YORK RAKE; MULCHING MACHINE; PAVING SCREED MACHINE;STATIONARY STEAM BOILER; PAVING CONCRETE FINISHING MACHINE; GROUT PUMP; PORTABLE STEAM BOILER; PORTABLE STEAM GENERATOR; ROLLER; SPREADER; ASPHALT PAVER; LOCOMOTIVES OR MACHINES USED IN PLACE THEREOF; TAMPER (SELF PROPELLED OR TRACTOR-DRAW); CAL TRACKS; BALLAST REGULATOR;RAIL ANCHOR MACHINE; SWITCH TAMPER; TIRE TRUCK (WORCESTER (EXCEPT | $57.18 | $33.70 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 1 SHOVELS; CRAWLERS AND TRUCK CRANES INCLUDING ALL TOWER; SELF-PROPELLED HYDRAULIC CRANES 10 TONS AND OVER; DRAGLINES; CLAM SHELLS; CABLEWAYS; SHAFT HOISTS; MUCKING MACHINES DERRICKS; BACKHOES; BULLDOZERS; GRADALLS; ELEVATING GRADERS; PILE DRIVERS; CONCRETE PAVERS; TRENCHING MACHINES; FRONT END LOADERS- 5 1/2 CU YDS AND OVER; DUAL DRUM PAVER; AUTOMATIC GRADER-EXCAVATOR(C.M.I. OR EQUAL); SCRAPERS TOWING PAN OR WAGON; TANDEM DOZERS OR PUSH CATS(2 UNITS IN TANDEM); SHOTCRETE MACHINE; TUNNEL B | $42.88 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 15 BOOM LENGTHS OVER 350 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.38 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 14 BOOM LENGTHS OVER 300 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $50.88 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 13 BOOM LENGTHS OVER 250 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $49.88 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 12 BOOM LENGTHS OVER 200 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.88 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 11 BOOM LENGTHS OVER 150 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.38 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 10 MASTER MECHANIC HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $46.38 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 9 OILER HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.37 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 8 TRUCK CRANE CREWS HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.06 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 7 COMPRESSORS UP TO 315 CU FT; SMALL MIXERS WITH SKIP; PUMPS UP TO 4 INCHES; POWER HEATERS; OILER; A-FRAME TRUCKS; FORKLIFTS-UP TO 7 FT. LIFT AND UP TO 3 TON CAPACITY; HYDRO BROOM; STUD WELDER. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $54.38 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 6 COMPRESSOR (ONE OR TWO) 315 CU FT TO 900 CU FT; PUMPS 4 INCHES TO 16 INCHES (TOTAL DISCHARGE). HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $36.06 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 5 HOISTS; CONVEYORS; POWER PAVEMENT BREAKERS; SELF-POWERED CONCRETE PAVEMENT FINISHING MACHINES; TWO BAG MIXERS WITH SKIP; MCCARTHY AND SIMILAR DRILLS; BATCH PLANTS (NOT SELF LOADING); BULK CEMENT PLANTS; SELF-PROPELLED MATERIAL SPREADERS; THREE OR MORE 10 KW LIGHT PLANTS; 30 KW OR MORE GENERATORS; POWER BROOM. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DA | $38.00 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 4 ASPHALT ROLLERS; SELF-POWERED ROLLERS AND COMPACTORS; TRACTOR WITHOUT BLADE DRAWING SHEEPSFOOT ROLLER; RUBBER TIRE ROLLER; VIBRATORY ROLLER OR OTHER TYPE OF COMPACTORS INCLUDING MACHINES FOR PULVERIZING AND AERATING SOIL; YORK RAKE. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.12 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 3 COMBINATION BACKHOE/LOADER UP TO 3/4 CU YD; SCRAPERS UP TO 21 CU YD (STRUCK LOAD, SELF PROPELLED OR TRACTOR DRAWN); TIREMAN; FRONT END LOADERS UP TO 4 YDS; WELL DRILLERS; ENGINEER OR FIREMAN ON HIGH PRESSURE BOILER; SELF-LOADING BATCH PLANT; WELL POINT OPERATORS ELECTRIC PUMPS USED IN WELL POINT SYSTEM; PUMPS, 16 INCHES AND OVER (TOTAL DISCHARGE); COMPRESSOR, ONE OR TWO 900 CU FT AND OVER; POWERED GREASE TRUCK; TUNNEL LOCOMOTIVES AND DINGYS; GROUT PUMPS; HYDRAULIC JACKS; BOOM TRUCK; HYDR | $42.35 | $31.04 |
| ENGI0098-005 | POWER EQUIPMENT OPERATORSGROUP 2 ROTARY DRILL WITH MOUNTED COMPRESSOR; COMPRESSOR HOUSE (3 TO 6 COMPRESSORS); ROCK AND EARTH BORING MACHINES (EXCLUDING MCCARTHY AND SIMILAR DRILLS); FRONT END LOADERS 4 CU YDS TO 5 1/2 CU YDS); FORKLIFTS-7 FT LIFT AND OVER 3 TON CAPACITY; SCRAPER 21 YDS AND OVER (STRUCK LOAD); SONIC HAMMER CONSOLE; RECLAIMERS ROAD PLANER/MILLING MACHINE; CAL TRACKS; BALLAST REGULATORS; RAIL ANCHOR MACHINES; SWITCH TAMPERS, ASPHALT PAVERS; MECHANIC; WELDER AND TRANSFER MACHINE. HAZARDOUS WASTE PREMIUM $2. | $42.57 | $31.04 |
| ROOF0033-001 | ROOFERS(ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL AREAS OF ANY TYPE WHERE A ROOF IS TO BE RELAID) | $53.53 | $35.69 |
| SHEE0017-004 | SHEET METAL WORKER(WORCESTER (HARVARD, LANCASTER)) | $60.00 | $48.78 |
| SHEE0063-002 | SHEET METAL WORKER(WORCESTER (EXCEPT HARVARD & LANCASTER)) | $43.48 | $36.46 |
| SFMA0669-002 | SPRINKLER FITTER | $53.25 | $29.75 |
| BRMA0003-001 | TERRAZZO FINISHER | $63.44 | $37.33 |
| TEAM0379-003 | TRUCK DRIVERSGROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VA | $41.24 | $37.35 |
| TEAM0379-003 | TRUCK DRIVERSGROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VAC | $41.53 | $37.35 |
| TEAM0379-003 | TRUCK DRIVERSGROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK | $41.82 | $37.35 |
| TEAM0379-003 | TRUCK DRIVERSGROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VAC | $40.78 | $37.35 |
| TEAM0379-003 | TRUCK DRIVERSGROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FO | $40.95 | $37.35 |
| TEAM0379-003 | TRUCK DRIVERSGROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 | $41.02 | $37.35 |
| TEAM0379-003 | TRUCK DRIVERSGROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEA | $41.14 | $37.35 |