Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 3 counties in Kentucky: Daviess, Hancock, McLean. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0040-001 | BOILERMAKER | $43.85 | $28.44 |
| SUKY2015-042 | BRICKLAYER | $25.09 | $10.05 |
| SUKY2015-042 | CARPENTER(DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $22.10 | $14.47 |
| SUKY2015-042 | CARPENTER(FORM WORK ONLY) | $24.29 | $8.21 |
| SUKY2015-042 | CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND FORM WORK | $20.57 | $13.25 |
| SUKY2015-042 | CEMENT MASON/CONCRETE FINISHER | $20.56 | $9.56 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC1701-002 |
| ELECTRICIAN |
| $37.10 |
| $20.03 |
| PAIN1165-027 | GLAZIER | $32.86 | $19.44 |
| IRON0044-017 | IRONWORKERORNAMENTAL | $37.77 | $23.90 |
| SUKY2015-042 | IRONWORKER, REINFORCING | $27.31 | $16.86 |
| SUKY2015-042 | IRONWORKER, STRUCTURAL | $29.44 | $9.01 |
| LABO0561-009 | LABORERMASON TENDER - BRICK | $28.89 | $19.20 |
| LABO1392-012 | LABORERCONCRETE SAW - HAND HELD/WALK BEHIND, GRADE CHECKER, JACK HAMMER, MASON TENDER - CEMENT/CONCRETE | $28.16 | $17.55 |
| LABO1392-013 | LABORERCARPENTER TENDER, DEMOLIOTION, FORM STRIPPING | $27.16 | $17.55 |
| LABO1445-002 | LABORERPOWER TOOL OPERATOR | $31.35 | $23.18 |
| SUKY2015-042 | LABORERPIPELAYER | $15.00 | $4.08 |
| SUKY2015-042 | LABORERCOMMON OR GENERAL | $18.71 | $7.08 |
| SUKY2015-042 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 |
| SUKY2015-042 | OPERATORROLLER | $23.60 | $12.65 |
| SUKY2015-042 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $27.38 | $9.10 |
| SUKY2015-042 | OPERATORBULLDOZER | $24.51 | $12.72 |
| PAIN0156-004 | PAINTERSPRAY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $30.62 | $20.30 |
| SUKY2015-042 | PAINTER(BRUSH AND ROLLER) | $18.79 | $5.88 |
| PLUM0633-003 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION) | $38.41 | $22.26 |
| PLUM0184-006 | PLUMBER | $44.26 | $20.28 |
| ENGI0181-053 | POWER EQUIPMENT OPERATORCRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 |
| ENGI0181-054 | POWER EQUIPMENT OPERATOR(DRILL) | $40.65 | $19.60 |
| ENGI0181-079 | POWER EQUIPMENT OPERATORLOADER | $40.65 | $19.60 |
| ENGI0181-080 | POWER EQUIPMENT OPERATORFORKLIFT | $40.65 | $19.60 |
| ENGI0181-093 | POWER EQUIPMENT OPERATOR(OILER) | $34.99 | $19.60 |
| ROOF0106-010 | ROOFER | $30.97 | $13.91 |
| SHEE0020-001 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $40.19 | $27.33 |
| SHEE0110-006 | SHEET METAL WORKER(EXCLUDES HVAC DUCT INSTALLATION) | $40.32 | $25.66 |
| SFKY0669-002 | SPRINKLER FITTER | $44.15 | $26.08 |
| SUKY2015-042 | TILE FINISHER | $15.42 | $7.24 |
| SUKY2015-042 | TILE SETTER | $20.96 | $0.00 |
| SUKY2015-042 | TRUCK DRIVERDUMP TRUCK | $23.60 | $8.03 |