Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Kentucky: Trigg. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0040-001 | BOILERMAKER | $43.85 | $28.44 |
| SUKY2015-036 | BRICKLAYER | $25.09 | $10.05 |
| SUKY2015-036 | CARPENTER(FORM WORK ONLY) | $22.54 | $7.12 |
| SUKY2015-036 | CARPENTER, EXCLUDES FORM WORK | $23.69 | $7.20 |
| SUKY2015-036 | CEMENT MASON/CONCRETE FINISHER | $20.56 | $9.56 |
| SUKY2015-036 | ELECTRICIAN | $30.50 | $9.21 |
| IRON0044-017 | IRONWORKERORNAMENTAL |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $37.77 |
| $23.90 |
| SUKY2015-036 | IRONWORKER, REINFORCING | $27.31 | $16.86 |
| SUKY2015-036 | IRONWORKER, STRUCTURAL | $25.41 | $7.63 |
| SUKY2015-036 | LABORERPIPELAYER | $15.00 | $4.08 |
| SUKY2015-036 | LABORERMASON TENDER - CEMENT/CONCRETE | $19.85 | $9.87 |
| SUKY2015-036 | LABORERCOMMON OR GENERAL | $18.04 | $0.00 |
| SUKY2015-036 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 |
| SUKY2015-036 | OPERATORBULLDOZER | $24.51 | $12.72 |
| SUKY2015-036 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $29.05 | $10.34 |
| SUKY2015-036 | OPERATORROLLER | $23.60 | $12.65 |
| PAIN0156-004 | PAINTERSPRAY FOOTNOTE A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $30.62 | $20.30 |
| SUKY2015-036 | PAINTER(BRUSH AND ROLLER) | $17.45 | $0.34 |
| PLUM0633-001 | PIPEFITTER | $38.41 | $22.26 |
| PLUM0184-006 | PLUMBER | $44.26 | $20.28 |
| ENGI0181-053 | POWER EQUIPMENT OPERATORCRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 |
| ENGI0181-054 | POWER EQUIPMENT OPERATOR(DRILL) | $40.65 | $19.60 |
| ENGI0181-079 | POWER EQUIPMENT OPERATORLOADER | $40.65 | $19.60 |
| ENGI0181-080 | POWER EQUIPMENT OPERATORFORKLIFT | $40.65 | $19.60 |
| ROOF0106-010 | ROOFER | $30.97 | $13.91 |
| SHEE0020-001 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $40.19 | $27.33 |
| SUKY2015-036 | SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $36.24 | $6.89 |
| SUKY2015-036 | TILE FINISHER | $15.42 | $7.24 |
| SUKY2015-036 | TILE SETTER | $20.96 | $0.00 |
| SUKY2015-036 | TRUCK DRIVERDUMP TRUCK | $23.60 | $8.03 |