Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 2 counties in Kentucky: Boyd, Greenup. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUKY2011-039 | CARPENTER(FORM WORK ONLY) | $24.80 | $8.76 |
| ELEC0369-008 | ELECTRICIAN | $40.96 | $22.44 |
| IRON0044-005 | IRONWORKER(STRUCTURAL AND REINFORCING) | $37.77 | $23.90 |
| IRON0070-011 | IRONWORKERORNAMENTAL | $36.17 | $25.80 |
| LABO0189-020 | LABORERCONCRETE WORKER | $26.87 | $19.66 |
| LABO0265-016 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) & PIPELAYER | $35.69 | $14.45 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABO0265-016 | LABORERFLAGGER | $35.52 | $14.45 |
| SUKY2011-039 | LABORERCOMMON OR GENERAL | $22.17 | $9.64 |
| SUKY2011-039 | LABORERCONCRETE FINISHING | $25.75 | $8.60 |
| SUKY2011-039 | OPERATOROILER | $24.34 | $13.00 |
| SUKY2011-039 | OPERATORTRENCHER | $26.27 | $12.37 |
| SUKY2011-039 | OPERATORLOADER | $26.68 | $13.00 |
| SUKY2011-039 | OPERATORMECHANIC | $28.60 | $11.83 |
| ENGI0181-016 | POWER EQUIPMENT OPERATORGROUP 1 CRANE; FORKLIFT OPERATORS ON CRANES WITH BOOM 150 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $0.75 ABOVE GROUP 1. ALL CRANES WITH PILING LEADS WILL RECEIVE $0.50 ABOVE GROUP 1 RATE REGARDLESS OF BOOM LENGTH. COMBINATION RATE SHALL MEAN $0.50 PER HOUR ABOVE THE BASIC HOURLY RATE OF PAY. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 |
| ENGI0181-016 | POWER EQUIPMENT OPERATORGROUP 1 Crane Forklift | $41.55 | $19.60 |
| ENGI0181-052 | POWER EQUIPMENT OPERATOR GROUP 1 Backhoe/Excavator/Trackhoe; Bulldozer; Drill; Pumpcrete; Roller(Bituminous) | $41.55 | $19.60 |
| ENGI0181-016 | POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; DRILL; PUMPCRETE; ROLLER(BITUMINOUS) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT A | $41.55 | $19.60 |
| ENGI0181-052 | POWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; ROLLER(ROCK) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY T | $38.69 | $19.60 |
| ENGI0181-052 | POWER EQUIPMENT OPERATOR GROUP 4 PUMP; ROLLER(EARTH) OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY | $38.37 | $19.60 |
| SUKY2011-039 | TRUCK DRIVERDUMP TRUCK | $17.82 | $3.26 |