Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Kentucky: Webster. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0090-001 | CARPENTER(FORM WORK ONLY) | $33.89 | $24.06 |
| ELEC1701-001 | ELECTRICIAN | $37.10 | $20.03 |
| IRON0070-001 | IRONWORKERORNAMENTAL AND REINFORCING | $36.17 | $25.80 |
| SUKY2011-036 | IRONWORKER, STRUCTURAL | $25.46 | $17.49 |
| LABO0265-015 | LABORERFLAGGER | $35.52 | $14.45 |
| LABO0561-013 | LABORERCONCRETE FINISHING | $29.45 | $18.77 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABO0561-013 |
| LABORERBACKFILLER, COMMON OR GENERAL, CONCRETE WORKER, FORM STRIPPING & GRADE CHECKER |
| $28.55 |
| $18.77 |
| LABO0561-013 | LABORERJACK HAMMER, PIPELAYER& TAMPER (HAND HELD/WALK BEHIND) | $28.80 | $18.77 |
| LABO1392-003 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $29.84 | $17.59 |
| SUKY2011-036 | OPERATORTRENCHER | $26.34 | $12.58 |
| SUKY2011-036 | OPERATORBULLDOZER | $23.63 | $10.98 |
| SUKY2011-036 | OPERATOROILER | $24.34 | $13.00 |
| SUKY2011-036 | OPERATORROLLER | $20.21 | $13.00 |
| ENGI0181-049 | POWER EQUIPMENT OPERATORGROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; DRILL; LOADER; MECHANIC; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUN | $41.55 | $19.60 |
| ENGI0181-049 | POWER EQUIPMENT OPERATORGROUP 2 BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10 | $38.69 | $19.60 |
| ENGI0181-049 | POWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER(INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 |
| SUKY2011-036 | TRUCK DRIVERDUMP TRUCK | $16.69 | $6.20 |