Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Kentucky: Monroe. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0064-007 | CARPENTER(FORM WORK ONLY) | $33.89 | $24.06 |
| SUKY2011-010 | CEMENT MASON/CONCRETE FINISHER | $21.60 | $10.35 |
| SUKY2011-010 | ELECTRICIAN | $32.35 | $2.18 |
| IRON0782-010 | IRONWORKER(PROJECTS OVER $20,000,000.00) | $37.47 | $26.49 |
| IRON0782-010 | IRONWORKER(PROJECTS UNDER $20,000,000.00) | $35.63 | $26.49 |
| LABO0189-014 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $27.12 | $19.66 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABO0189-014 | LABORERCONCRETE WORKER | $26.87 | $19.66 |
| SUKY2011-010 | LABORERFLAGGER | $18.31 | $8.89 |
| SUKY2011-010 | LABORERCOMMON OR GENERAL | $20.60 | $9.39 |
| SUKY2011-010 | LABORERPIPELAYER | $20.13 | $8.63 |
| ELEC0369-004 | LINE CONSTRUCTIONGROUNDMAN | $25.77 | $14.10 |
| ELEC0369-004 | LINE CONSTRUCTIONLINEMAN | $43.84 | $18.80 |
| ELEC0369-004 | LINE CONSTRUCTIONEQUIPMENT OPERATOR | $39.15 | $17.58 |
| SUKY2011-010 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $23.60 | $12.65 |
| SUKY2011-010 | OPERATORLOADER | $30.35 | $0.00 |
| SUKY2011-010 | OPERATORBULLDOZER | $20.99 | $6.33 |
| ENGI0181-010 | POWER EQUIPMENT OPERATORGROUP 4 Oiler | $38.37 | Employee... 9.50 |
| ENGI0181-010 | POWER EQUIPMENT OPERATORGROUP 1 Crane; Drill; Grader/Blade; Mechanic; Scraper Operators on cranes with booms 150 feet and over (including jib) shall receive $1.00 above Group 1 rate; 250 feet and over including jib shall receive $1.50 above Class 1 rate. Combination Rate: All crane operators operating cranes, where the length of the boom in combination with the length of the piling leads equal or exceeds 150 feet, shall receive $1.00 above the Group 1 rate | $41.55 | Employee... 9.50 |
| ENGI0181-010 | POWER EQUIPMENT OPERATORGROUP 2 Bobcat/Skid Steer/Skid Loader; Forklift | $38.69 | Employee... 9.50 |