Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Kentucky: Franklin. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUKY2011-003 | CEMENT MASON/CONCRETE FINISHER | $21.51 | $10.00 |
| SUKY2011-003 | ELECTRICIAN | $32.35 | $2.18 |
| IRON0782-010 | IRONWORKER(PROJECTS UNDER $20,000,000.00) | $35.63 | $26.49 |
| IRON0782-010 | IRONWORKER(PROJECTS OVER $20,000,000.00) | $37.47 | $26.49 |
| LABO0189-002 | LABORERBACKFILLER, CARPENTER TENDER, CONCRETE WORKER, DUMPMAN & GRADE CHECKER | $26.87 | $19.66 |
| LABO0189-002 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND), PIPELAYER & VIBRATING PLATE | $27.12 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $19.66 |
| LABO0561-003 | LABORERFORM WORKER | $28.80 | $18.77 |
| SUKY2011-003 | LABORERFLAGGER | $18.31 | $8.89 |
| SUKY2011-003 | LABORERCOMMON OR GENERAL | $20.61 | $10.00 |
| SUKY2011-003 | OPERATORLOADER | $25.35 | $13.00 |
| SUKY2011-003 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $26.42 | $12.70 |
| SUKY2011-003 | OPERATORBULLDOZER | $29.96 | $13.00 |
| ENGI0181-010 | POWER EQUIPMENT OPERATORGROUP 1 CRANE; DRILL; GRADER/BLADE; MECHANIC; SCRAPER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 1 | $41.55 | $9.50 |
| ENGI0181-010 | POWER EQUIPMENT OPERATORGROUP 2 BOBCAT/SKID STEER/SKID LOADER; FORKLIFT OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABO | $38.69 | $9.50 |
| ENGI0181-010 | POWER EQUIPMENT OPERATOR GROUP 4 OILER OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER(INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $9.50 |