Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Kansas: Franklin. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUKS2019-074 | CARPENTER, INCLUDES FORM WORK | $19.64 | $4.00 |
| SUKS2019-074 | CEMENT MASON/CONCRETE FINISHER | $28.92 | $15.80 |
| SUKS2019-074 | ELECTRICIAN | $29.93 | $14.14 |
| IRON0010-015 | IRONWORKER(REINFORCING AND STRUCTURAL) | $39.00 | $34.25 |
| LABO0663-017 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $37.45 | $15.87 |
| LABO1290-002 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR | $37.45 | $15.87 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUKS2019-074 |
| LABORERMASON TENDER - CEMENT/CONCRETE |
| $29.75 |
| $12.83 |
| SUKS2019-074 | LABORERFLAGGER | $13.20 | $0.00 |
| SUKS2019-074 | LABORERCOMMON OR GENERAL | $17.11 | $0.00 |
| SUKS2019-074 | LINE CONSTRUCTIONEQUIPMENT OPERATOR | $32.15 | $15.06 |
| SUKS2019-074 | LINE CONSTRUCTIONGROUNDMAN | $26.76 | $12.71 |
| SUKS2019-074 | LINE CONSTRUCTIONLINEMAN | $41.52 | $17.56 |
| SUKS2019-074 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.88 | $15.53 |
| SUKS2019-074 | OPERATORROLLER | $17.11 | $2.94 |
| SUKS2019-074 | OPERATORROTO MILL GROUNDMAN | $18.43 | $0.00 |
| SUKS2019-074 | OPERATORSCRAPER | $17.67 | $0.00 |
| SUKS2019-074 | OPERATORSTRIPING MACHINE | $27.27 | $12.25 |
| SUKS2019-074 | OPERATORSCREED | $17.38 | $3.52 |
| SUKS2019-074 | OPERATORTRACTOR | $24.28 | $0.00 |
| SUKS2019-074 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $35.23 | $15.53 |
| SUKS2019-074 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $33.35 | $14.10 |
| SUKS2019-074 | OPERATORBULLDOZER | $28.15 | $11.65 |
| SUKS2019-074 | OPERATORCONCRETE FINISHING MACHINE | $24.26 | $0.00 |
| SUKS2019-074 | OPERATORCONCRETE SAW | $33.87 | $15.16 |
| SUKS2019-074 | OPERATORCRANE | $30.38 | $11.08 |
| SUKS2019-074 | OPERATORGRADER/BLADE | $29.66 | $12.55 |
| SUKS2019-074 | OPERATORLOADER | $32.46 | $14.14 |
| SUKS2019-074 | OPERATORMATERIAL TRANSFER VEHICLE | $14.65 | $0.00 |
| SUKS2019-074 | OPERATORMECHANIC | $32.25 | $15.31 |
| ENGI0101-023 | POWER EQUIPMENT OPERATORBROOM/SWEEPER | $40.17 | $22.29 |
| ENGI0101-023 | POWER EQUIPMENT OPERATORROTO MILL | $40.17 | $22.29 |
| SUKS2019-074 | TRAFFIC CONTROLSERVICE DRIVER | $18.72 | $7.52 |
| SUKS2019-074 | TRAFFIC SIGNALIZATIONTRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $17.10 | $0.00 |
| SUKS2019-074 | TRUCK DRIVERDUMP AND TANDEM | $29.04 | $12.45 |
| SUKS2019-074 | TRUCK DRIVERFLATBED AND LOWBOY | $27.96 | $14.05 |
| SUKS2019-074 | TRUCK DRIVEROFF ROAD TRUCK | $19.06 | $0.00 |
| TEAM0541-013 | TRUCK DRIVERWATER TRUCK | $38.04 | $15.85 |