Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Kansas: Douglas. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUKS2019-073 | CARPENTER, INCLUDES FORM WORK | $22.95 | $8.15 |
| SUKS2019-073 | CEMENT MASON/CONCRETE FINISHER | $27.45 | $10.10 |
| SUKS2019-073 | ELECTRICIAN | $29.93 | $14.14 |
| SUKS2019-073 | IRONWORKER, REINFORCING | $29.90 | $26.11 |
| IRON0010-009 | IRONWORKER, STRUCTURAL | $39.00 | $34.25 |
| SUKS2019-073 | LABORERCOMMON OR GENERAL | $17.91 | $8.21 |
| SUKS2019-073 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $29.21 |
| $14.63 |
| SUKS2019-073 | LABORERFLAGGER | $13.20 | $0.00 |
| SUKS2019-073 | LABORERMASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 |
| SUKS2019-073 | OPERATORMECHANIC | $25.45 | $9.49 |
| SUKS2019-073 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.84 | $15.53 |
| SUKS2019-073 | OPERATORROLLER | $23.02 | $11.73 |
| SUKS2019-073 | OPERATORROTO MILL GROUNDMAN | $18.43 | $0.00 |
| SUKS2019-073 | OPERATORROTO MILL | $22.67 | $11.87 |
| SUKS2019-073 | OPERATORSCRAPER | $17.67 | $0.00 |
| SUKS2019-073 | OPERATORSCREED | $16.93 | $0.00 |
| SUKS2019-073 | OPERATORSTRIPING MACHINE | $27.27 | $12.25 |
| SUKS2019-073 | OPERATORLOADER | $26.01 | $11.30 |
| SUKS2019-073 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $24.57 | $11.57 |
| SUKS2019-073 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $24.18 | $12.13 |
| SUKS2019-073 | OPERATORBROOM/SWEEPER | $19.71 | $0.00 |
| SUKS2019-073 | OPERATORBULLDOZER | $21.23 | $7.77 |
| SUKS2019-073 | OPERATORCONCRETE FINISHING MACHINE | $24.26 | $0.00 |
| SUKS2019-073 | OPERATORCRANE | $23.49 | $8.55 |
| SUKS2019-073 | OPERATORGRADER/BLADE | $25.14 | $9.03 |
| SUKS2019-073 | OPERATORMATERIAL TRANSFER VEHICLE | $14.65 | $0.00 |
| SUKS2019-073 | TRAFFIC CONTROLSERVICE DRIVER | $17.22 | $2.44 |
| SUKS2019-073 | TRAFFIC SIGNALIZATIONTRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $16.54 | $0.00 |
| SUKS2019-073 | TRUCK DRIVERDUMP AND TANDEM | $23.23 | $11.51 |
| SUKS2019-073 | TRUCK DRIVERFLATBED AND LOWBOY | $23.82 | $9.89 |
| SUKS2019-073 | TRUCK DRIVEROFF ROAD TRUCK | $19.06 | $0.00 |
| SUKS2019-073 | TRUCK DRIVERWATER TRUCK | $21.96 | $10.82 |