Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 3 counties in Kansas: Franklin, Miami, Wyandotte. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0027-005 | ASBESTOS WORKER/HEAT & FROST INSULATOR(MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)) | $45.60 | $35.47 |
| BRKS0015-012 | BRICKLAYER | $43.57 | $23.02 |
| CARP0315-003 | CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) | $43.28 | $21.25 |
| CARP0315-004 | CARPENTER(EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FLOOR LAYING CARPET) | $44.63 | $22.40 |
| CARP1181-001 | CARPENTER(FLOOR LAYING-CARPET ONLY) | $40.94 | $21.25 |
| SUKS2015-029 | CARPENTER(DRYWALL HANGING ONLY) |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $30.00 |
| $1.62 |
| PLAS0518-009 | CEMENT MASON/CONCRETE FINISHER | $40.13 | $20.50 |
| ELEC0124-010 | ELECTRICIAN(LOW VOLTAGE WIRING ONLY) | $37.61 | $22.60 |
| ELEC0124-011 | ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING) | $51.01 | $26.25 |
| ELEV0012-004 | ELEVATOR MECHANIC A. VACATION PAY6% FOR 6 MONTHS TO 5 YEARS SERVICE; 8% WITH 5 OR MORE YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $60.69 | $38.44 |
| PAIN0558-006 | GLAZIER | $39.32 | $22.34 |
| IRON0010-032 | IRONWORKERORNAMENTAL, REINFORCING AND STRUCTURAL | $39.00 | $34.25 |
| LABO1290-008 | LABORERMASON TENDER - BRICK (FRANKLIN COUNTIES) | $24.22 | $11.38 |
| LABO1290-012 | LABORERCOMMON OR GENERAL | $31.60 | $16.95 |
| SUKS2015-029 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $31.51 | $11.60 |
| SUKS2015-029 | LABORERLANDSCAPE | $12.48 | $0.00 |
| SUKS2015-029 | LABORERMASON TENDER - CEMENT/CONCRETE | $17.86 | $1.01 |
| LABO1290-011 | LABORERSASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $31.99 | $16.03 |
| SUKS2015-029 | OPERATORROLLER | $32.68 | $13.57 |
| SUKS2015-029 | OPERATORBULLDOZER | $33.12 | $13.96 |
| SUKS2015-029 | OPERATORLOADER | $30.35 | $12.04 |
| PAIN2012-008 | PAINTERBRUSH, ROLLER, AND SPRAY | $36.18 | $19.97 |
| PAIN2012-010 | PAINTERDRYWALL FINISHING/TAPING | $36.18 | $19.97 |
| PLUM0533-013 | PIPEFITTER(INCLUDING HVAC PIPE, UNIT, AND INSTALLATION OF HVAC ELECTRICIAL/TEMPERATURE CONTROLS) | $55.56 | $25.80 |
| SUKS2015-029 | PLASTERER | $29.85 | $13.29 |
| PLUM0008-020 | PLUMBER | $54.28 | $23.79 |
| ENGI0101-042 | POWER EQUIPMENT OPERATOROILER | $39.93 | $22.42 |
| ENGI0101-042 | POWER EQUIPMENT OPERATORFORKLIFT | $44.14 | $22.42 |
| ENGI0101-042 | POWER EQUIPMENT OPERATORCRANE | $45.89 | $22.42 |
| ENGI0101-042 | POWER EQUIPMENT OPERATORBOBCAT/SKID STEER/SKID LOADER | $45.48 | $22.42 |
| ENGI0101-042 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $45.48 | $22.42 |
| ENGI0101-042 | POWER EQUIPMENT OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $45.48 | $22.42 |
| ENGI0101-042 | POWER EQUIPMENT OPERATORGRADER/BLADE | $45.48 | $22.42 |
| ROOF0020-021 | ROOFER | $38.45 | $22.29 |
| SHEE0002-011 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $52.18 | $27.15 |
| SHEE0002-012 | SHEET METAL WORKER(EXCLUDES HVAC DUCT INSTALLATION) | $52.18 | $27.15 |
| SUKS2015-029 | SPRINKLER FITTER(FIRE SPRINKLERS) | $26.68 | $11.61 |
| BRKS0015-014 | TILE FINISHER | $20.74 | $1.46 |
| BRKS0015-011 | TILE SETTER | $42.73 | $18.39 |
| SUKS2015-029 | TRUCK DRIVERDUMP (ALL TYPES) | $27.29 | $10.71 |
| TEAM0541-010 | TRUCK DRIVERLOWBOY TRUCK | $39.89 | $15.85 |
| TEAM0541-011 | TRUCK DRIVERSEMI-TRAILER TRUCK | $39.89 | $15.85 |