Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Kansas: Finney. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0027-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.60 | $35.47 |
| BRKS0015-015 | BRICKLAYER | $29.07 | $15.61 |
| SUKS2015-003 | CARPENTER | $18.74 | $3.86 |
| SUKS2015-003 | CEMENT MASON/CONCRETE FINISHER | $17.59 | $3.33 |
| SUKS2015-003 | ELECTRICIAN | $27.58 | $10.98 |
| IRON0010-031 | IRONWORKER, REINFORCING | $39.00 | $34.25 |
| SUKS2015-003 | IRONWORKER, STRUCTURAL | $23.02 | $15.09 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUKS2015-003 | LABORERCOMMON OR GENERAL | $12.92 | $1.62 |
| SUKS2015-003 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $15.72 | $1.95 |
| PAIN2012-007 | PAINTERBRUSH AND ROLLER | $36.18 | $19.97 |
| PLUM0441-001 | PIPEFITTER | $45.90 | $19.94 |
| SUKS2015-003 | PLUMBER | $27.79 | $10.85 |
| SUKS2015-003 | ROOFER | $14.33 | $2.48 |
| SHEE0002-035 | SHEET METAL WORKER(EXCLUDES HVAC DUCT INSTALLATION) | $52.18 | $27.15 |
| SUKS2015-003 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $23.18 | $5.83 |