Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Illinois: Effingham. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ENGI0841-013 | BACKHOE | $45.15 | $26.00 |
| BRIL0008-012 | BRICKLAYER | $31.56 | $22.28 |
| CARP0243-010 | CARPENTER(INCLUDING DRYWALL AND BATT INSULATION) | $30.34 | $28.25 |
| PLAS0143-015 | CEMENT MASON/CONCRETE FINISHER | $32.60 | $18.91 |
| ELEC0146-008 | ELECTRICIAN(EFFINGHAM COUNTY (BANNER, BISHOP, DOUGLAS, LIBERTY, LUCAS, MOCCASIN ST. FRANCIS, SUMMIT & TEULOPOLIS)) | $28.05 | $16.73 |
| ELEC0702-013 | ELECTRICIANWORK NOT TO EXCEED 8-PLEX FAMILY HOUSING UNITS (EFFINGHAM COUNTY (EXCLUDING BANNER, BISHOP, DOUGLAS, LIBERTY, LUCAS, MOCCASIN, ST. FRANCIS, SUMMIT, AND TEULOPOLIS TWPS)) |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $32.58 |
| $12.11 |
| ELEC0702-013 | ELECTRICIANALL OTHER WORK (EFFINGHAM COUNTY (EXCLUDING BANNER, BISHOP, DOUGLAS, LIBERTY, LUCAS, MOCCASIN, ST. FRANCIS, SUMMIT, AND TEULOPOLIS TWPS)) | $44.99 | $23.48 |
| LABO1197-003 | LABORER | $31.51 | $27.03 |
| PAIN1705-009 | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $27.30 | $20.07 |
| PLAS0143-015 | PLASTERER | $32.35 | $20.82 |
| PLUM0149-002 | PLUMBER, PIPEFITTER, STEAMFITTER, INCLUDING HVAC(MULTI-FAMILY) | $30.71 | $11.61 |
| PLUM0149-002 | PLUMBER, PIPEFITTER, STEAMFITTER, INCLUDING HVAC(SINGLE FAMILY AND DUPLEX) | $29.21 | $11.61 |
| SUIL1996-011 | ROOFER | $12.67 | $0.00 |
| SHEE0268-006 | SHEET METAL WORKER(INCLUDING HVAC) | $34.27 | $17.44 |