Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Illinois: Ogle. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0790-007 | CARPENTER(INCLUDING DRYWALL HANGING AND BATT INSULATION) RATE A - MULTI-UNIT BUILDING/STRUCTURE CONTAINING MORE THAN EIGHT (8) UNITS USED EXCLUSIVELY AS INDIVIDUAL RESIDENCES WHETHER THEY BE LEASED OR RENTED | $31.32 | $26.23 |
| CARP0790-007 | CARPENTER(INCLUDING DRYWALL HANGING AND BATT INSULATION) RATE B - SINGLE FAMILY HOME, DUPLEX AND A MULTI-UNIT BUILDING UP TO AND INCLUDING EIGHT (8) UNITS SUCH AS A ROWHOUSE, TOWNHOUSE AND CONDOMINIUM | $24.61 | $15.94 |
| CARP0792-005 | CARPENTERINCLUDING SOFT FLOOR LAYER AND BATT/BLOWN INSULATION (OGLE COUNTY (NORTHERN HALF)) | $37.19 | $26.60 |
| PLAS0011-007 | CEMENT MASON/CONCRETE FINISHER | $27.43 | $22.21 |
| ELEC0364-006 | ELECTRICIAN | $30.61 | $28.17 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABO0727-004 | LABORERSCOMMON AND LANDSCAPE | $19.88 | $11.87 |
| SUIL1996-001 | LABORERSPLANTSMAN | $9.00 | $0.00 |
| ENGI0150-031 | OPERATORPOWER EQUIPMENT, GROUP 1 BACKHOES WITH CAISSON ATTACHMENT*: COMBINATION BACKHOE FRONT ENDLOADER CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*;CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY);CRETER CRANE; FORMLESS CURB AND GUTTER MACHINE*; GRADER, HIGHLIFT SHOVELS OR FRONT ENDLOADER 2 1/4 YD. AND OVER; HYDRAULIC BACKHOES*; PUMP CRETES DUAL RAM(REQUIRING FREQUENT LUBRICATION AND WATER); | $56.75 | $51.05 |
| ENGI0150-031 | OPERATORPOWER EQUIPMENT, GROUP 2 BULLDOZERS; GREASER ENGINEER;HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; ROLLERS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); (OGLE COUNTY) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAP | $56.05 | $51.05 |
| ENGI0150-031 | OPERATORPOWER EQUIPMENT, GROUP 3 PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, (OGLE COUNTY) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE | $53.60 | $51.05 |
| ENGI0150-031 | OPERATORPOWER EQUIPMENT, GROUP 4 OILERS (OGLE COUNTY) PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAP | $51.60 | $51.05 |
| PAIN0030-004 | PAINTERBRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 |
| PLUM0023-003 | PLUMBER/PIPEFITTER | $55.54 | $31.43 |
| ROOF0011-006 | ROOFER | $50.25 | $30.43 |
| SHEE0219-002 | SHEET METAL WORKER(INCLUNDING HVAC) | $39.47 | $31.55 |
| BRIL0021-013 | TERRAZZO WORKER/SETTER | $44.38 | $25.84 |
| BRIL0021-013 | TILE SETTER | $45.49 | $25.72 |
| TEAM0330-006 | TRUCK DRIVER2-3 AXLES (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA | $44.83 | $0.30 |
| TEAM0330-006 | TRUCK DRIVER4 AXLES (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, | $44.98 | $0.30 |
| TEAM0330-006 | TRUCK DRIVER5 AXLES (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, | $45.18 | $0.30 |
| TEAM0330-006 | TRUCK DRIVER6 AXLES (OGLE COUNTY (NORTH OF ROUTE 72/EAST OF ROUTE 251, ADELINE, BYRON, CRESTON, DEMENT, FORRESTON NORTH OF ROUTE 72, LEAF RIVER NORTH OF ROUTE 72, LYNNVILLE, MONROE, ROCHELLE, & SCOTT)) FOOTNOTE: A. HEALTH AND WELFARE $468.00 PER WEEK; PENSION $644.34 PER WEEK LOW BOY CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, | $45.38 | $0.30 |
| TEAM0722-003 | TRUCK DRIVER,GROUP 1 DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY. (OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $45.29 | $25.42 |
| TEAM0722-003 | TRUCK DRIVER, GROUP 2(OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $45.88 | $25.42 |
| TEAM0722-003 | TRUCK DRIVER, GROUP 3(OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $46.15 | $25.42 |
| TEAM0722-003 | TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS.(OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $46.54 | $25.42 |
| TEAM0722-003 | TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK.(OGLE COUNTY (SOUTH OF ROUTE 72/WEST OF ROUTE 251)) | $47.64 | $25.42 |