Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Illinois: Montgomery. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRIL0008-025 | BRICKLAYER | $33.13 | $22.05 |
| CARP0270-012 | CARPENTER & SOFT FLOOR LAYER | $30.02 | $28.60 |
| ELEC0146-011 | ELECTRICIAN(MONTGOMERY COUNTY (EAST OF BUTLER GROVE, GRISHAM, HILLSBORO & RAYMOND TWPS)) | $28.05 | $16.73 |
| ELEC0193-007 | ELECTRICIAN(MONTGOMERY COUNTY (BOIS D ARC, PITMAN, AND HARVEL TWPS)) | $24.83 | $17.12 |
| ELEC0309-006 | ELECTRICIAN(MONTGOMERY COUNTY (WEST OF BUTLER GROVE, ISHAM, AND RAYMOND TWPS)) | $35.73 | $19.66 |
| PAIN1168-005 | GLAZIER(MONTGOMERY COUNTY) |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $39.77 |
| $22.73 |
| IRON0046-010 | IRONWORKER(MONTGOMERY COUNTY (EXCEPT LITCHFIELD, HILLSBORO & SOUTH THEREOF)) | $36.20 | $31.35 |
| IRON0392-006 | IRONWORKER(MONTGOMERY COUNTY (LITCHFIELD, HILLSBORO, AND SOUTH THEREOF)) | $41.65 | $31.18 |
| LABO1084-002 | LABORER GROUP 1 GENERAL LABORERS.(MONTGOMERY COUNTY (LITCHFIELD)) | $32.41 | $32.32 |
| LABO1084-002 | LABORER GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER(MONTGOMERY COUNTY (LITCHFIELD)) | $32.91 | $32.32 |
| LABO1084-002 | LABORER GROUP 3 DYNAMITE AND POWDER MAN(MONTGOMERY COUNTY (LITCHFIELD)) | $33.91 | $32.32 |
| LABO1084-003 | LABORERS, GROUP 1 GENERAL LABORER(MONTGOMERY COUNTY (HILLSBORO)) | $32.41 | $32.32 |
| LABO1084-003 | LABORERS, GROUP 2 ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; LEAD BASE PAINT WORKER(MONTGOMERY COUNTY (HILLSBORO)) | $32.91 | $32.32 |
| LABO1084-003 | LABORERS, GROUP 3 DYNAMITE MAN(MONTGOMERY COUNTY (HILLSBORO)) | $33.91 | $32.32 |
| PAIN0058-010 | PAINTER EPOXY OR TOXIC-LEAD-BASED PAINT WORK-$1.00 PREMIMUM | $31.39 | $21.58 |
| PLUM0553-003 | PLUMBER(MONTGOMERY COUNTY (SOUTHWEST OF RT 127)) FOOTNOTE: A. 4 HOURS PAID HOLIDAYFOR CHRISTMAS EVE IF HOLIDAY FALLS ON MONDAY THROUGH FRIDAY | $51.61 | $21.45 |
| PLUM0137-004 | PLUMBER, PIPEFITTER, STEAMFITTER(MONTGOMERY COUNTY (NORTH AND EAST OF RT. 127 INCLUDING HILLSBORO AND SCHRAM CITY)) | $37.88 | $25.71 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 03 AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE; SIPHON OR JET; LIGHT PLANT ONE; HEATER ONE; IMMOBILE TRACK AIR ONE | $35.34 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 02 ASSISTANT OPERATORS | $39.82 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 01 CRANES, DRAGLINES, SHOVELS, SKIMMER SCOOPS, CLAMSHELLS OR DERRICK BOATS, PILE DRIVERS, CRANE-TYPE BACKHOES, ASPHALT PLANT OPERATORS, CONCRETE PLANT OPERATORS, DREDGES, ASPHALT SPREADING MACHINES, SCREWS ON ASPHALT SPREADING MACHINES, ALL LOCOMOTIVES, CABLE WAYS OR TOWER MACHINES, HOISTS, HYDRAULIC BACKHOES, DITCHING MACHINES, OR BACKFILLER, CHERRYPICKERS, OVERHEAD CRANES, ROLLER, STEAM OR GAS, CONCRETE PAVERS, EXCAVATOR CONCRETE BREAKERS, CONCRETE PUMPS, BULK CEMENT PLANTS, CEMENT PUMPS | $40.95 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 04 FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILER; HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE OVER 65 TONS CAPACITY; CONCRETE PLANT OILER AND BLACK TOP PLANT OILER | $41.95 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 05 OILERS | $42.95 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 06 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 100 FT AND OVER, BUT LESS THAN 150 FT | $43.50 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 07 OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS, 150 FT AND OVER, BUT LESS THAN 200 FT | $43.80 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 08 OPERATORS ON EQUIPMENT WITH BOOMNS, INCLUDING JIBS, 200 FT AND OVER; TOWER CRANES, AND WHIRLEY CRANES | $44.10 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 09 CERTIFIED CRANE OPERATORS, BELOW 17.5 TONS, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $44.75 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 10 CERTIFIED CRANE OPERATORS 17.5 TONS AND ABOVE, WHEN REQUESTED BY THE CONTRACTOR OR REQUIRED BY THE OWNER | $45.25 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 11 MASTER MECHANIC | $42.95 | $34.95 |
| ENGI0520-006 | POWER EQUIPMENT OPERATORGROUP 12 LICENSED BOAT PILOT | $43.95 | $34.95 |
| ROOF0112-002 | ROOFER | $36.00 | $26.36 |
| SHEE0268-005 | SHEET METAL WORKER | $34.27 | $17.44 |
| TEAM0525-003 | TRUCK DRIVERGROUP 1: DRIVERS ON 2 AXLES HAULING LESS THAN 9 TONS; AIR COMPRESSOR & WELDING MACHINES AND BROOMS, INCLUDING THOSE PULLED BY SEPARATE UNITS; TRUCK DRIVER HELPER, WAREHOUSE EMPLOYEES; MECHANIC HELPERS; GREASERS AND TIREMEN; PICK-UP TRUCKS WHEN HAULING MATERIAL, TOOLS, OR WORKERS TO AND FROM AND ON THE JOB SITE; AND FORKLIFTS UP TO 6,000 LB CAPACITY | $45.35 | $25.72 |
| TEAM0525-003 | TRUCK DRIVERGROUP 2- 2 OR 3 AXLES HUALING MORE THAN 9 TONS BUT HAULING LESS THAN 16 TONS; A-FRAME WINCH TRUCKS; HYDROLIFT TRUCKS; VACTOR TRUCKS OR SIMILAR EQUIPMENT WHEN USED FOR TRANSPORTATION PURPOSES; FORKLIFT OVER 6,000 LB.CAPACITY; WINCH TRUCKS; AND FOUR AXLE COMBIATION UNITS | $45.93 | $25.72 |
| TEAM0525-003 | TRUCK DRIVERGROUP 3- 2, 3 OR 4 AXLES HAULING 16 TONS OR MORE; 5-AXLES OR MORE COMBINATION UNITS; DRIVERS ON WATER PULLS; ARTICULATED DUMP TRUCKS; MECHANICS AND WORKING FOREPERSONS | $46.25 | $25.72 |
| TEAM0525-003 | TRUCK DRIVERGROUP 4: LOW BOY AND OIL DISTRIBUTORS | $46.60 | $25.72 |
| TEAM0525-003 | TRUCK DRIVERGROUP 5: DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK | $47.71 | $25.72 |