Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Illinois: Winnebago. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP0792-004 | CARPENTER(INCLUDING SOFT FLOOR LAYER AND BATT/BLOWN INSULATION) | $37.19 | $26.60 |
| PLAS0011-019 | CEMENT MASON/CONCRETE FINISHER(WINNEBAGO COUNTY) | $41.03 | $36.39 |
| ELEC0364-004 | ELECTRICIAN | $30.61 | $28.17 |
| ELEV0132-003 | ELEVATOR MECHANIC FOOTNOTESA. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR UNDER 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, VETERANS' DAY AND CHRISTMAS DAY | $65.17 | $38.44 |
| LABO0032-003 | LABORER | $19.88 | $11.87 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUIL1996-001 |
| LABORERSPLANTSMAN |
| $9.00 |
| $0.00 |
| ENGI0150-027 | OPERATORPOWER EQUIPMENT: GROUP 4 OILERS; PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE RATED CAPACITY IN EXCESS OF 50 TON. LONG BOOM PAY AND CAPACITY PAY CAN | $51.60 | $51.05 |
| ENGI0150-027 | OPERATORPOWER EQUIPMENT: GROUP 1 MECHANIC; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*: COMBINATION BACKHOE FRONT ENDLOADER MACHINE; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE PUMP (TRUCK MOUNTED); CONCRETE TOWER; CRANES*; CRANES, HAMMERHEAD*; CRANES, (GCI AND SIMILAR TYPE REQUIRES TWO OPERATORS ONLY); CRETER CRANE; FORMLESS CURB AND GUTTER MACHINE*; GRADER, ELEVATING; FRONT ENDLOADER 2 1/4 YD. AND OVER; HYDRAULIC BACKHOES*; PUMP CRETES DUAL RAM(REQUIRING FREQUENT | $56.75 | $51.05 |
| ENGI0150-027 | OPERATORPOWER EQUIPMENT: GROUP 2 BULLDOZERS; GREASER ENGINEER; FRONT END LOADERS UNDER 2 1/4 CU YD; ROLLERS; STEAM GENERATORS; TRACTORS; TRACTOR DRAWN VIBRATORY ROLLER (RECEIVES AN ADDITIONAL $.50 PER HOUR); *-REQUIRES OILER PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM C | $56.05 | $51.05 |
| ENGI0150-027 | OPERATORPOWER EQUIPMENT: GROUP 3 PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; PREMIUM PAY: LONG BOOM: CRANES & DERRICKS 90' TO 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR. CRANES & DERRICKS OVER 150' INCLUDING JIB RECEIVE AN EXTRA $.50 PER HOUR PLUS AN ADDITIONAL $.10 FOR EACH ADDITIONAL 10' OF BOOM OR JIB. CAPACITY PAY: CRANES & DERRICKS WITH MAXIMUM CAPACITY EXCEEDING 50 TON WITH LESS THAN 90' OF BOOM OR JIB SHALL BE COMPENSATED $.01 PER HOUR FOR EACH TON OF THE R | $53.60 | $51.05 |
| PAIN0030-004 | PAINTERBRUSH, ROLLER, SPRAY, SANDBLASTING, PAPERHANGER, DRYWALL FINISHING, TAPER, AND SPRAY STRUCTURAL STEEL (BOONE, JO DAVIESS, LEE, OGLE, STEPHENSON AND WINNEBAGO COUNTIES) | $45.15 | $29.41 |
| PLAS0011-019 | PLASTERER(WINNEBAGO COUNTY) | $37.90 | $37.66 |
| PLUM0023-002 | PLUMBER | $55.54 | $31.43 |
| ROOF0011-006 | ROOFER | $50.25 | $30.43 |
| SHEE0219-002 | SHEET METAL WORKER(INCLUNDING HVAC) | $39.47 | $31.55 |
| BRIL0006-025 | TILE SETTER | $38.52 | $21.86 |
| TEAM0325-004 | TRUCK DRIVER2 - 3 AXLES (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.47 | $26.70 |
| TEAM0325-004 | TRUCK DRIVER4 AXLES (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.62 | $26.70 |
| TEAM0325-004 | TRUCK DRIVER5 AXLES (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.82 | $26.70 |
| TEAM0325-004 | TRUCK DRIVER6 AXLES (BOONE AND WINNEBAGO COUNTIES) FOOTNOTE: AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $48.93 | $26.70 |