Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building, Heavy, Highway, Residential
Covers 1 county in Illinois: Cook. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0017-001 | ASBESTOS WORKER/INSULATOR(INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $55.02 | $35.75 |
| BOIL0001-001 | BOILERMAKER | $53.10 | $38.54 |
| BRIL0021-001 | BRICKLAYER | $44.88 | $26.62 |
| CARP0555-001 | CARPENTERCARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Building) | $52.01 | $38.85 |
| CARP0555-001 | CARPENTERCARPENTER, LATHER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER (Heavy & Highway) | $52.01 | $38.85 |
| CARP0555-002 | CARPENTER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $45.61 |
| $35.31 |
| PLAS0502-001 | CEMENT MASON/CONCRETE FINISHER | $53.10 | $43.80 |
| ELEC0134-001 | ELECTRICIAN | $57.75 | $42.89 |
| ELEC0134-003 | ELECTRICIANELECTRICAL TECHNICIAN: THE WORK SHALL CONSIST OF THE INSTALLATION, OPERATION, INSPECTION, MAINTENANCE, REPAIR AND SERVICE OF RADIO, TELEVISION, RECORDING, VOICE SOUND VISION PRODUCTION AND REPRODUCTION, TELEPHONE AND TELEPHONE INTERCONNECT, FACSIMILE, DATA APPATATUS, COAXIAL, FIBRE OPTIC AND WIRELESS EQUIPMENT, APPLIANCES AND SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION OF SIGNALS OF ANY NATURE, BUSINESS, DOMESTIC, COMMERCIAL, EDUCATION, ENTERTAINMENT AND RESIDENTIAL PURPOSES, INCLUDING BUT N | $51.14 | $30.55 |
| ELEV0002-001 | ELEVATOR MECHANIC FOOTNOTESA) PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING DAY; VETERANS' DAY AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEE WITH LESS THAN 5 YEARS SERVICE | $70.68 | $38.44 |
| ASBE0017-001 | FIRE STOP TECHNICIAN | $44.02 | $32.76 |
| PAIN0027-001 | GLAZIER | $51.55 | $44.09 |
| ASBE0017-001 | HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $41.27 | $32.76 |
| IRON0001-026 | IRONWORKERSTRUCTURAL AND REINFORCING | $62.46 | $46.58 |
| IRON0001-026 | IRONWORKERSHEETER | $62.71 | $46.58 |
| IRON0063-001 | IRONWORKERORNAMENTAL | $59.26 | $44.81 |
| IRON0063-002 | IRONWORKER(FENCE ERECTOR) | $52.25 | $34.31 |
| IRON0136-001 | IRONWORKER(MACHINERY MOVERS; RIGGERS; MACHINERY ERECTORS) | $54.25 | $47.38 |
| IRON0136-001 | IRONWORKERMASTER RIGGERS | $56.75 | $47.38 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 2 FIREPROOFING AND FIRE SHOP LABORERS | $51.40 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 4 CHIMNEY OVER 40 FT.; SCAFFOLD LABORERS | $51.50 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 7 JACKHAMMERMEN; POWER DRIVEN CONCRETE SAWS; AND OTHER POWER TOOLS | $51.63 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 6 STONE DERRICKMEN & HANDLERS | $51.60 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 5 CEMENT GUN NOZZLE LABORERS (GUNITE); WINDLASS AND CAPSTAN PERSON | $51.55 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 10 BOILER SETTER PLASTIC LABORERS | $51.85 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 11 JACKHAMMERMEN ON FIRE BRICK WORK ONLY | $51.68 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 12 DOSIMETER USE (ANY DEVICE) MONITORING NUCLEAR EXPOSURE); ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS | $52.40 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 1 BUILDING LABORERS; PLASTERER TENDERS; PUMPS FOR DEWATERING; AND OTHER UNCLASSIFIED LABORERS | $51.40 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 3 CEMENT GUN | $51.48 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 9 CHIMNEY ON FIRE BRICK; CAISSON DIGGERS; & WELL POINT SYSTEM MEN | $51.75 | $36.94 |
| LABO0002-006 | LABORER, BUILDING & RESIDENTIALGROUP 8 FIREBRICK & BOILER LABORERS | $51.73 | $36.94 |
| LABO0002-008 | LABORER, COMPRESSED AIR0 - 15 POUNDS | $52.40 | $36.94 |
| LABO0002-008 | LABORER, COMPRESSED AIR34 - AND OVER | $55.40 | $36.94 |
| LABO0002-008 | LABORER, COMPRESSED AIR27 - 33 POUNDS | $54.40 | $36.94 |
| LABO0002-008 | LABORER, COMPRESSED AIR21 - 26 POUNDS | $53.40 | $36.94 |
| LABO0002-008 | LABORER, COMPRESSED AIR16 - 20 POUNDS | $52.90 | $36.94 |
| LABO0225-001 | LABORER, DEMOLITION/WRECKINGGROUP 3 ASBESTOS WORK WITH COMPLETE DEMOLITION/WRECKING OR STRIP OUT WORK | $51.40 | $36.94 |
| LABO0225-001 | LABORER, DEMOLITION/WRECKINGGROUP 1 COMPLETE DEMOLITION | $46.40 | $36.94 |
| LABO0225-001 | LABORER, DEMOLITION/WRECKINGGROUP 2 INTERIOR WRECKING AND STRIP OUT WORK | $51.40 | $36.94 |
| LABO0002-007 | LABORER, HEAVY & HIGHWAYGROUP 3 CEMENT GUN NOZZLE (LABORERS), GUNITE | $51.55 | $36.94 |
| LABO0002-007 | LABORER, HEAVY & HIGHWAYGROUP 5 ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE | $51.40 | $36.94 |
| LABO0002-007 | LABORER, HEAVY & HIGHWAYGROUP 1 COMMON LABORER; TENDERS; MATERIAL EXPEDITOR (ASPHALT PLANT); STREET PAVING, GRADE SEPARATION, SIDEWALK, CURB & GUTTER, STRIPPERS & ALL LABORERS NOT OTHERWISE MENTIONED | $51.40 | $36.94 |
| LABO0002-007 | LABORER, HEAVY & HIGHWAYGROUP 2 ASPHALT TAMPERS & SMOOTHERS; CEMENT GUN LABORERS | $51.48 | $36.94 |
| LABO0002-007 | LABORER, HEAVY & HIGHWAYGROUP 4 RAKERS, LUTEMEN; MACHINE-SCREWMEN; KETTLEMEN; MIXERMEN; DRUN-MEN; JACKHAMMERMEN (ASPHALT); PAINTMEN; MITRE BOX SPREADERS; LABORERS ON BIRCH, OVERMAN AND SIMILAR SPREADER EQUIPMENT; LABORERS ON APSCO; LABORERS ON AIR COMPRESSOR; PAVING FORM SETTER; JACKHAMMERMEN (CONCRETE); POWER DRIVE CONCRETE SAWS; OTHER POWER TOOLS | $51.68 | $36.94 |
| LABO0002-008 | LABORER, TUNNEL AND SEWERGROUP 4 AIR TRAC DRILL OPERATOR; MINER; BRICKLAYER TENDERS; CONCRETE BLOWER OPERATOR; DRILLERS; DYNAMITERS; ERECTOR OPERATOR; FORM MEN; JACKHAMMERMEN; POWERPAC; MINING MACHINE OPERATORS; MUCKING MACHINE OPERATOR; LASER BEAM OPERATOR; LINER PLATE AND RING SETTERS; SHIELD DRIVERS; POWER KNIFE OPERATOR; WELDER- BURNERS; PIPE JACKING MACHINE OPERATOR; SKINNERS; MAINTENANCE TECHNICIAN | $51.75 | $36.94 |
| LABO0002-008 | LABORER, TUNNEL AND SEWERGROUP 5 ASBESTOS ABATEMENT LABORER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; DOSIMETER (ANY DEVICE) MONITORING NUCLEAR EXPOSURE LABORER CLASSIFICATIONS (SEWER) | $51.40 | $36.94 |
| LABO0002-008 | LABORER, TUNNEL AND SEWERGROUP 1 CAGE TENDERS; DUMPMEN; FLAGMEN; SIGNALMEN; TOP LABORERS | $51.40 | $36.94 |
| LABO0002-008 | LABORER, TUNNEL AND SEWERGROUP 2 AIR HOIST OPERATOR; KEY BOARD OPERATOR; CONCRETE LABORER; GROUT; LOCK TENDERS (FREE AIR SIDE); STEEL SETTERS; TUGGERS; SWITCHMEN; CAR PUSHER | $51.53 | $36.94 |
| LABO0002-008 | LABORER, TUNNEL AND SEWERGROUP 3 CONCRETE REPAIRMEN; LOCK TENDERS (PRESSURE SIDE); MORTAR MEN; MUCKERS; GROUT MACHINE OPERATORS; TRACK LAYERS | $51.63 | $36.94 |
| ELEC0009-003 | LINE CONSTRUCTION(LINEMAN AND EQUIPMENT OPERATOR) | $62.10 | $37.29 |
| ELEC0009-003 | LINE CONSTRUCTIONGROUNDMAN | $48.44 | $29.09 |
| BRIL0021-009 | MARBLE FINISHER | $33.95 | $26.03 |
| BRIL0021-004 | MARBLE MASON | $44.63 | $26.83 |
| ENGI0150-006 | OPERATORPOWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCAT (OVER 3/4 CU YD); BOILERS; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TRACT | $63.50 | $51.00 |
| ENGI0150-006 | OPERATORPOWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL CONSTRUCTION) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER | $64.80 | $51.00 |
| ENGI0150-006 | OPERATORPOWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL CONSTRUCTION) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS | $60.95 | $51.00 |
| ENGI0150-006 | OPERATORPOWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL CONSTRUCTION) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $59.20 | $51.00 |
| ENGI0150-025 | OPERATORPOWER EQUIPMENT, GROUP 5 (HEAVY AND HIGHWAY CONSTRUCTION) BOBCATS (ALL); BRICK FORKLIFTS; OILERS; DIRECTIONAL BORING | $57.80 | $51.00 |
| ENGI0150-025 | OPERATORPOWER EQUIPMENT, GROUP 4 (HEAVY AND HIGHWAY CONSTRUCTION) AIR COMPRESSOR - SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR - LARGE OVER 250; COMBINATION - SMALL EQUIPMENT OPERATOR; DIRECTIONAL BORING MACHINE; GENERATORS - SMALL 50 KW AND UNDER; GENERATORS - LARGE , OVER 50 KW; HEATERS, MECHANICAL; HYDRAULIC POWER UNIT (PILE DRIVING, EXTRACTING OR DRILLING); LIGHT PLANTS (1 TO 5); PUMPS, OVER 3"" (1 TO 3, NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; TRACTAIRE | $59.00 | $51.00 |
| ENGI0150-025 | OPERATORPOWER EQUIPMENT, GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) BOILERS; BROOMS, ALL POWER PROPELLED; CEMENT SUPPLY TENDER; COMPRESSOR, COMMON RECEIVER (2); CONCRETE MIXER, TWO BAG AND OVER; CONVEYOR, PORTABLE; FARM TYPE TRACTORS USED FOR MOWING, SEEDING, ETC; FIREMAN ON BOILERS; FORKLIFT TRUCKS; GROUTING MACHINES; HOISTS, AUTOMATIC; HOISTS, ALL ELEVATORS; HOISTS, TUGGER SINGLE DRUM; JEEP DIGGERS; LOW BOYS; PIPE JACKING MACHINES; POST-HOLE DIGGER; POWER SAW, CONCRETE, POWER DRIVEN; PUG MILLS; ROLLERS, | $60.40 | $51.00 |
| ENGI0150-025 | OPERATORPOWER EQUIPMENT, GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION) BATCH PLANT*; BITUMINOUS MIXER; BOILER AND THROTTLE VALVE; BULLDOZER; CAR LOADER TRAILING CONVEYORS; COMBINATION BACKKHOE FRONT END LOADER MACHINE, (LESS THAN 1 CU YD BACKHOE BUCKET WITH ATTACHMENTS); COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER (3); CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SERIES TO AND INCLUDING 27 CU FT; CONCRETE SPREADER; CONCRETE CURING MACHINE; BURLAP MACH | $62.45 | $51.00 |
| ENGI0150-025 | OPERATORPOWER EQUIPMENT, GROUP 1 (HEAVY AND HIGHWAY CONSTRUCTION) ASPHALT PLANT*; ASPHALT HEATER AND PLANER COMBINATION; ASPHALT HEATER SCARFIRE*, ASPHALT SPREADER; AUTOGRADER/ GOMACO OR SIMILAR; ABG PAVER*, BACKHOES WITH CAISSON ATTACHMENT*, BALLAST REGULATOR, BELT LOADER*; CAISSON RIGS*CAR DUMPER, CENTRAL REDI-MIX PLANT*, COMBINATION BACKHOE; FRONT END LOADER MACHINE (1 CU YD OR OVER BACKHOE BUCKET OR WITH ATTACHMENTS); CONCRETE BREAKER (TRUCK MOUNTED); CONCRETE CONVEYOR; CONCRETE PAVER OVER 27E CU FT | $63.00 | $51.00 |
| PAIN0014-001 | PAINTER(INCLUDING TAPER) | $53.05 | $33.91 |
| PLUM0597-002 | PIPEFITTER | $55.00 | $38.62 |
| PLAS0005-002 | PLASTERER | $42.25 | $26.65 |
| PLUM0130-001 | PLUMBER | $60.50 | $39.02 |
| BRIL0021-012 | POINTER, CLEANER AND CAULKER | $45.42 | $24.06 |
| ROOF0011-001 | ROOFER | $50.25 | $30.43 |
| SHEE0073-001 | SHEET METAL WORKER | $49.10 | $42.91 |
| SHEE0073-002 | SHEET METAL WORKER(ALUMINUM GUTTER WORK) | $31.32 | $37.02 |
| SFIL0281-001 | SPRINKLER FITTER | $63.25 | $36.50 |
| BRIL0021-006 | TERRAZZO WORKER/SETTER | $44.38 | $25.84 |
| BRIL0021-006 | TILE FINISHER | $38.56 | $22.10 |
| BRIL0021-006 | TILE SETTER | $45.49 | $25.72 |
| TEAM0731-002 | TRAFFIC CONTROL DEVICE MONITOR(TRAFFIC SAFETY WORKER: PRIMARY DUTIES INCLUDE BUT ARE NOT LIMITED TO THE DELIVERY, MAINTENANCE AND PICK-UP OF TRAFFIC CONTROL DEVICES, THE SET-UP AND INSTALLATION OF TRAFFIC SIGNS, PAVEMENT MARKINGS, BARRICADES, CRASH BARRELS AND GLARE SCREENS, TRAFFIC CONTROL SURVEILLANCE, THE REPAIR AND MAINTENANCE TRUCKS, CARS, ARROW BOARDS, MESSAGE SIGNS, BARRICADE AND SIGN FABRICATION EQUIPMENT) | $43.40 | $22.71 |
| TEAM0731-001 | TRUCK DRIVER4 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1. | $45.80 | $30.27 |
| TEAM0731-001 | TRUCK DRIVER2 OR 3 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONA | $45.55 | $30.27 |
| TEAM0731-001 | TRUCK DRIVER5 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1. | $46.00 | $30.27 |
| TEAM0731-001 | TRUCK DRIVER6 AXLES (COOK COUNTY - HEAVY AND HIGHWAY) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. C. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1. | $46.20 | $30.27 |
| TEAM0786-001 | TRUCK DRIVER2 & 3 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLI | $53.95 | $0.30 |
| TEAM0786-001 | TRUCK DRIVER4 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS | $54.21 | $0.30 |
| TEAM0786-001 | TRUCK DRIVER5 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS | $54.43 | $0.30 |
| TEAM0786-001 | TRUCK DRIVER6 AXLES (COOK COUNTY - BUILDING AND RESIDENTIAL) FOOTNOTES: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY WORK CLASSIFICATION IS AN ADDITIONAL $1.50 PER HOUR. HEALTH AND WELFARE: $445.00 PER WEEK PENSION: $408 PER WEEK. B. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION. PAID HOLIDAYS | $54.64 | $0.30 |