Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building, Residential
Covers 7 counties in Illinois: Du Page, Grundy, Kane, Kendall, Lake, McHenry, Will. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0017-005 | ASBESTOS WORKER/INSULATOR(INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $55.02 | $35.75 |
| BOIL0001-003 | BOILERMAKER(DU PAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | $53.10 | $38.54 |
| BRIL0014-001 | BRICKLAYER(DU PAGE, GRUNDY, LAKE, AND WILL COUNTIES) | $48.56 | $34.05 |
| BRIL0027-002 | BRICKLAYER(KANE, KENDALL, AND MCHENRY COUNTIES) | $44.88 | $26.62 |
| CARP0555-003 | CARPENTERHEAVY & HIGHWAY (DUPAGE ANE LAKE COUNTIES) | $52.01 | $38.85 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARP0555-003 |
| CARPENTERBUILDING (DUPAGE ANE LAKE COUNTIES) |
| $52.01 |
| $38.85 |
| CARP0555-004 | CARPENTERRESIDENTIAL (DU PAGE AND LAKE COUNTIES) | $45.61 | $35.31 |
| CARP0555-007 | CARPENTER(WILL COUNTY RESIDENTIAL) | $45.61 | $35.31 |
| CARP0555-009 | CARPENTERCARPENTER, FLOOR LAYER, LATHER, MILLWRIGHT, AND PILEDRIVER (KANE, KENDALL, AND MCHENRY COUNTIES BUILDING) | $52.01 | $38.86 |
| CARP0555-010 | CARPENTER(KANE, KENDALL, AND MCHENRY COUNTIES RESIDENTIAL) | $45.61 | $35.31 |
| CARP0555-012 | CARPENTER, CARPENTER, MILLWRIGHT, PILEDRIVER, AND SOFT FLOOR LAYER(GRUNDY COUNTY) | $45.61 | $35.31 |
| CARP0555-006 | CARPENTER; MILLWRIGHT; PILEDRIVERMEN(WILL COUNTY BUILDING) | $52.01 | $41.41 |
| PLAS0011-008 | CEMENT MASON/CONCRETE FINISHER(DE KALB, KANE, KENDALL, AND MCHENRY COUNTIES) | $50.70 | $40.60 |
| PLAS0011-012 | CEMENT MASON/CONCRETE FINISHER(GRUNDY AND WILL COUNTIES) | $46.25 | $45.10 |
| PLAS0011-014 | CEMENT MASON/CONCRETE FINISHER(LAKE COUNTY) | $48.50 | $42.82 |
| PLAS0803-002 | CEMENT MASON/CONCRETE FINISHER(DUPAGE COUNTY) | $38.00 | $24.03 |
| ELEC0117-002 | ELECTRICIANBUILDING (KANE (NORTHERN HALF) AND MCHENRY COUNTIES) | $59.11 | $42.23 |
| ELEC0117-003 | ELECTRICIANELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND SHARE A COMMON CABLE, AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE, PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK).THE WORK SHALL COVER TH | $48.71 | $35.87 |
| ELEC0117-004 | ELECTRICIANRESIDENTIAL (KANE (NORTHERN HALF) AND MCHENRY COUNTIES) | $44.40 | $34.59 |
| ELEC0150-002 | ELECTRICIANBUILDING (LAKE COUNTY) | $51.87 | $51.77 |
| ELEC0150-003 | ELECTRICIANELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND SHARE A COMMON CABLE, AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE, PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK).THE WORK SHALL COVER TH | $48.00 | $39.85 |
| ELEC0176-003 | ELECTRICIANRESIDENTIAL (GRUNDY AND WILL COUNTIES) | $46.87 | $33.38 |
| ELEC0176-008 | ELECTRICIANBUILDING (GRUNDY AND WILL COUNTIES) | $52.00 | $45.01 |
| ELEC0176-015 | ELECTRICIANELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND SHARE A COMMON CABLE, AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE, PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK).THE WORK SHALL COVER TH | $44.00 | $37.91 |
| ELEC0461-002 | ELECTRICIANBUILDING (KANE (SOUTHERN HALF) AND KENDALL COUNTIES) | $60.17 | $43.50 |
| ELEC0461-005 | ELECTRICIANELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND SHARE A COMMON CABLE, AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE, PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK).THE WORK SHALL COVER TH | $49.70 | $38.45 |
| ELEC0701-002 | ELECTRICIANRESIDENTIAL (DUPAGE COUNTY) | $39.60 | $32.25 |
| ELEC0701-003 | ELECTRICIANELECTRICAL TECHNICIAN: WORK INCLUDES THE INSTALLATION, MAINTENANCE AND REMOVAL OF TELECOMMUNICATION FACILITIES (VOICE, SOUND, DATA AND VIDEO), TELEPHONE, SECURITY, FIRE ALARM SYSTEMS THAT ARE A COMPONENT OF A MULTIPLEX SYSTEM AND SHARE A COMMON CABLE, AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICE, PABX AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN, (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEM DIGITAL NETWORK).THE WORK SHALL COVER TH | $40.90 | $44.32 |
| ELEV0002-002 | ELEVATOR MECHANIC(DU PAGE, KANE, KENDALL, LAKE, & WILL COUNTIES) FOOTNOTES: A) PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING DAY; VETERANS' DAY AND CHRISTMAS DAY. B) EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEE WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEE WITH LESS THAN 5 YEARS SERVICE | $70.68 | $38.44 |
| ELEV0055-001 | ELEVATOR MECHANIC(GRUNDY COUNTY) FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR UNDER 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; VETERANS' DAY & CHRISTMAS DAY | $57.99 | $38.44 |
| ELEV0015-002 | ELEVATOR MECHANIC MCHENRY COUNTY) FOOTNOTESA. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR UNDER 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, VETERANS' DAY AND CHRISTMAS DAY | $61.96 | $38.44 |
| ASBE0017-005 | FIRE STOP TECHNICIAN | $44.02 | $32.76 |
| PAIN0027-003 | GLAZIER | $51.55 | $44.09 |
| ASBE0017-005 | HAZARDOUS MATERIAL HANDLER(INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | $41.27 | $32.76 |
| IRON0001-014 | IRONWORKERSHEETER (DU PAGE (EASTERN 1/4), LAKE, AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF) COUNTIES) | $62.71 | $46.58 |
| IRON0001-014 | IRONWORKERSTRUCTURAL AND REINFORCING (DU PAGE (EASTERN 1/4), LAKE, AND MCHENRY (HEBRON, WOODSTOCK, AND EAST THEREOF) COUNTIES) | $62.46 | $46.58 |
| IRON0063-004 | IRONWORKERFENCE ERECTOR (LAKE, DUPAGE (EASTERN 1/4), AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES) | $52.25 | $34.31 |
| IRON0136-002 | IRONWORKERMASTER RIGGERS (LAKE, DUPAGE (EASTERN 1/4) AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES) | $56.75 | $47.38 |
| IRON0136-002 | IRONWORKERMACHINERY MOVERS; RIGGERS; MACHINERY ERECTORS (LAKE, DUPAGE (EASTERN 1/4) AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES) | $54.25 | $47.38 |
| IRON0393-002 | IRONWORKER(DUPAGE (REMAINDER), KANE, KENDALL (NORTHERN PART), AND MCHENRY (SOUTHEAST 1/4) COUNTIES) | $48.83 | $39.84 |
| IRON0444-002 | IRONWORKER(DUPAGE (ARGONNE & VIC), GRUNDY, KENDALL (SOUTHERN PART), AND WILL COUNTIES) | $47.80 | $42.50 |
| IRON0498-006 | IRONWORKER(MCHENRY COUNTY (NORTHWEST PART)) | $41.37 | $44.41 |
| IRON0063-003 | IRONWORKER, ORNAMENTAL(LAKE, DUPAGE (EASTERN 1/4) AND MCHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES) | $59.26 | $44.81 |
| LABO0075-001 | LABORERGROUP 6 ALL UNDERGROUND CAVERN LABORERS; CAISSON LABORERS 50 FEET OR MORE BELOW GROUND LEVEL; LABORERS WORKING UNDER RADIO ACTIVE CONDITIONS (SUITING UP); BLASTING MEN (POWDERMEN) (GRUNDY AND WILL COUNTIES) | $47.75 | $33.16 |
| LABO0075-001 | LABORERGROUP 3 ASPHALT RAKERS; HOD CARRIERS; PLASTERER LABORERS; GUNNITE LABORERS, SLAB FOR SETTERS ON ROADS, HIGHWAYS, STREETS, AIRPORT RUNAWAYS, AND RADII (ANY TYPE OF FORM) STRINGLINE MEN FOR ALL AFOREMENTIONED WORK; WAGON AND TOWER DRILLERS ON LAND AND FLOATING PLANT USED ON DREDGING; ASPHALT GUNNERS AND PLUG MEN (UNDERCOATING ON ROAD WORK); MORTAR PUMP LABORERS; PLASTER PUMP LABORERS (GRUNDY AND WILL COUNTIES) | $47.48 | $33.16 |
| LABO0075-001 | LABORERGROUP 2 SEWER AND DRAIN PIPE LAYERS AND MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED, ON PUBLIC UTILITY WORK (GROUND LEVEL TO 8 FEET); PUMPCRETE PIPE HANDLERS (GRUNDY AND WILL COUNTIES) | $47.40 | $33.16 |
| LABO0075-001 | LABORERGROUP 5 GUNNITE NOZZLE MEN; CAISSON LABORERS AND ALL TAMPING HAMMERS FROM 150 LBS AND OVER; FROM 15 FEET BELOW GROUND LEVEL DOWN TO 50 FEET; AND ALL LABORERS WORKING INSIDE OF A SPHERE OR ANY TYPE OF TANK FOR EVERY ADDITIONAL 50 FEET OR PART THEREOF ABOVE 100 FEET IN HEIGHT (GRUNDY AND WILL COUNTIES) | $47.60 | $33.16 |
| LABO0149-001 | LABORERGROUP 5 JACKHAMMER & AIRSPADE; CHAINSAW, SWINGING STAGE AND BOATSWAIN CHAIR; CEMENT GUN NOZZLEMAN; HOD CARRIER; PLASTERER TENDER, AND TUNNEL MAN KANE, KENDALL, AND MCHENRY COUNTIES | $51.65 | $36.94 |
| LABO0149-001 | LABORERGROUP 1 COMMON LABORER KANE, KENDALL, AND MCHENRY COUNTIES | $51.40 | $36.94 |
| LABO0149-001 | LABORERGROUP 2 POWER VIBRATOR KANE, KENDALL, AND MCHENRY COUNTIES | $51.65 | $36.94 |
| LABO0149-001 | LABORERGROUP 4 POWER TAMPER KANE, KENDALL, AND MCHENRY COUNTIES | $51.65 | $36.94 |
| LABO0149-001 | LABORERGROUP 6 TILE LAYERS; BOTTOM MEN KANE, KENDALL, AND MCHENRY COUNTIES | $52.10 | $36.94 |
| LABO0149-001 | LABORERGROUP 7 CAISSON LABORERS; DYNAMITERS KANE, KENDALL, AND MCHENRY COUNTIES | $52.10 | $36.94 |
| LABO0002-003 | LABORER GROUP 10 BOILER SETTER PLASTIC LABORERS(DU PAGE COUNTY) | $51.85 | $36.94 |
| LABO0152-001 | LABORER GROUP 10 BOILER SETTER PLASTIC LABORERS(LAKE COUNTY) | $51.95 | $36.94 |
| LABO0152-001 | LABORER GROUP 11 DOSIMETER(ANY DEVICE) MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (LAKE COUNTY) | $51.60 | $36.94 |
| LABO0002-003 | LABORER GROUP 11 JACKHAMMERMEN ON FIRE BRICK WORK ONLY(DU PAGE COUNTY) | $51.68 | $36.94 |
| LABO0002-003 | LABORER GROUP 12 DOSIMETER(ANY DEVICE) MONITORING NUCLEAR EXPOSURE); ASBESTOS ABATEMENT LABORERS; TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (DU PAGE COUNTY) | $52.40 | $36.94 |
| LABO0152-001 | LABORER GROUP 1 BUILDING LABORERS; PLASTERER TENDERS, GENERAL LABORERS(WRECKING AND DEMOLITION); FIREPROOFING AND FIRE SHOP LABORERS (LAKE COUNTY) | $51.40 | $36.94 |
| LABO0002-003 | LABORER GROUP 1 BUILDING LABORERS, PLASTERER TENDERS, PUMPS FOR DEWATERING & OTHER UNCLASSIFIED LABORERS(DU PAGE COUNTY) | $51.40 | $36.94 |
| LABO0075-001 | LABORER GROUP 1 MORTAR MIXERS, HANDLING ASPHALT SHINGLES; SCAFFOLDS; SEWER AND TRENCH WORK(GROUND LEVEL DOWN TO 8 FEET); CATCH BASIN AND MANHOLE DIGGERS, MESH HANDLING ON ROAD WORK; CEMENT AND MINERAL FILLER HANDLER; CONCRETE PUDDLERS; BATCH DUMPERS (CEMENT & ASPHALT); VIBRATOR OPERATORS; SAND AND STONE WHEELERS TO MIXER HANDLERS); CONCRETE WHEELERS; AIRTAMPING HAMMERMEN; CONCRETE & PAVING BREAKERS; ROCK DRILLERS/JACKHAMMERMEN; CHIPPING HAMMERMEN 1-BAG MIXER; ASPHALT LABORER; CHAIN AND POWER SAWS; PIT MEN; FENCING LABORERS; MASON TENDERS (MORTAR AND BRICK WHEELER); KETTLEMEN & TARMEN | $47.40 | $33.16 |
| LABO0152-001 | LABORER GROUP 2 CEMENT GUN LABORERS AND HOSE(LAKE COUNTY) | $51.48 | $36.94 |
| LABO0002-003 | LABORER GROUP 2 FIREPROOFING AND FIRE SHOP LABORERS(DU PAGE COUNTY) | $51.40 | $36.94 |
| LABO0002-003 | LABORER GROUP 3 CEMENT GUN LABORERS AND HOSE(DU PAGE COUNTY) | $51.48 | $36.94 |
| LABO0152-001 | LABORER GROUP 3 CHIMNEY OVER 40 FEET; SCAFFOLD LABORERS; WALL MEN OR WRECKERS(LAKE COUNTY) | $51.50 | $36.94 |
| LABO0149-001 | LABORER GROUP 3 TORCHMAN(DEMOLITION ONLY), MORTARMEN KANE, KENDALL, AND MCHENRY COUNTIES | $51.40 | $36.94 |
| LABO0152-001 | LABORER GROUP 4 CEMENT GUN NOZZLE(GUNITE) LABORERS (LAKE COUNTY) | $51.60 | $36.94 |
| LABO0002-003 | LABORER GROUP 4 CHIMNEY OVER 40 FEET; SCAFFOLD LABORERS; WELDMAN-WRECKERS BURNERS(DU PAGE COUNTY) | $51.50 | $36.94 |
| LABO0075-001 | LABORER GROUP 4 TUNNEL MINERS, AND ALL LABORERS INSIDE TUNNEL; AIR BLOW PIPEMEN; TORCHMEN(BURNERS); MORTARING MEN ON SEWER AND DRAIN PIPE (THE APPLYING OF MORTAR AND COMPOSITION MIXES); ALL BOTTOM MEN ON SEWER WORK-ALL SEWER AND DRAIN PIPELAYERS-MULTIPLE CONCRETE DUCT OR ANY OTHER TYPE OF PIPE USED ON PUBLIC UTILITY WORK-8 FEET OR MORE BELOW GROUND LEVEL, AND ALL OTHER SEWER AND TRENCH LABORERS 8 FEET OR MORE BELOW GROUND LEVEL REGARDLESS OF EXCAVATION AREA; ALL LABOR WORK INSIDE COFFERDAM; USE OF A 10 FOOT OR MORE DRILL STEEL FOR HAND HELD DRILLS; CAISSON LABORERS GROUND LEVEL DOWN | $47.60 | $33.16 |
| LABO0002-003 | LABORER GROUP 5 CEMENT GUN NOZZLE(GUNITE) LABORERS; WINDLASS AND CAPSTAN PERSON (DU PAGE COUNTY) | $51.55 | $36.94 |
| LABO0152-001 | LABORER GROUP 5 STONE DERRICKMEN AND HANDLERS(LAKE COUNTY) | $51.60 | $36.94 |
| LABO0152-001 | LABORER GROUP 6 JACKHAMMERMEN(TAMPERS & VIBRATORS); POWER DRIVEN CONCRETE SAWS (LAKE COUNTY) | $51.63 | $36.94 |
| LABO0002-003 | LABORER GROUP 6 STONE DERRICKMEN AND HANDLERS(DU PAGE COUNTY) | $51.60 | $36.94 |
| LABO0075-001 | LABORER GROUP 7 DOSIMETER(ANY DEVICE) USED FOR MONITORING NUCLEAR EXPOSURE; ASBESTOS ABATEMENT WORKER; TOXIC AND HAZARDOUS WASTE REMOVAL LABORER; AND CHIMNEY AND SILO LABORERS FOR EVERY ADDITIONAL 50 FEET OR ANY PART THEREOF ABOVE 100 FEET HIGH (GRUNDY AND WILL COUNTIES) | $47.60 | $33.16 |
| LABO0152-001 | LABORER GROUP 7 FIREBRICK & BOILER LABORER SETTERS(LAKE COUNTY) | $51.73 | $36.94 |
| LABO0002-003 | LABORER GROUP 7 JACKHAMMERMEN, POWER DRIVEN CONCRETE SAWS AND OTHER POWER EQUIPMENT(DU PAGE COUNTY) | $51.63 | $36.94 |
| LABO0149-001 | LABORER GROUP 8 ASBESTOS ABATEMENT LABORERS, TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS, DOSIMETER(ANY DEVICE) MONITORING NUCLEAR EXPOSUREANE KENDALL, AND MCHENRY COUNTIES | $51.80 | $36.94 |
| LABO0152-001 | LABORER GROUP 8 CHIMNEY LABORERS(ON FIRE BRICK); CAISSON DIGGERS; WELL POINT SYSTEM MEN (LAKE COUNTY) | $51.75 | $36.94 |
| LABO0002-003 | LABORER GROUP 8 FIREBRICK & BOILER LABORERS(DU PAGE COUNTY) | $51.73 | $36.94 |
| LABO0002-003 | LABORER GROUP 9 CHIMNEY ON FIRE BRICK; CAISSON DIGGERS; WELL POINT SYSTEM MEN(DU PAGE COUNTY) | $51.75 | $36.94 |
| LABO0152-001 | LABORER GROUP 9 WINDLASS AND CAPSTAN PERSONS(LAKE COUNTY) | $51.60 | $36.94 |
| ELEC0009-002 | LINE CONSTRUCTIONLINEMAN AND EQUIPMENT OPERATOR (WILL COUNTY) | $62.10 | $37.29 |
| ELEC0009-002 | LINE CONSTRUCTIONGROUNDMAN (WILL COUNTY) | $48.44 | $29.09 |
| TEAM0301-001 | LOWBOY IS AN ADDITIONAL $1.50 PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX(6) AXLES. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEARS - 3 WEEKS PAID VACATION; 20 YEARS - 4 WEEKS PAID VACATION | $45.09 | $13.40 |
| BRIL0021-010 | MARBLE FINISHER | $33.95 | $26.03 |
| BRIL0021-002 | MARBLE SETTER | $47.71 | $33.20 |
| ENGI0150-026 | OPERATORPOWER EQUIPMENT, GROUP 4 (BUILDING AND RESIDENTIAL) BOBCATS AND/OR OTHER SKID STEER LOADERS; BRICK FORKLIFTS; OILERS | $59.20 | $51.00 |
| ENGI0150-026 | OPERATORPOWER EQUIPMENT, GROUP 3 (BUILDING AND RESIDENTIAL) AIR COMPRESSOR-SMALL 250 AND UNDER (1 TO 5 NOT TO EXCEED A TOTAL OF 300 FT); AIR COMPRESSOR-LARGE OVER 250; COMBINATION-SMALL EQUIPMENT OPERATOR; GENERATOR- SMALL 50 KW AND UNDER; GENERATOR-LARGE OVER 50 KW; HEATERS, MECHANICAL; HOISTS, INSIDE ELEVATORS (REMODELING OR RENOVATIN WORK); HYDRUALIC POWER UNITS (PILE DRIVING, EXTRACTING, AND DRILLING); LOW BOYS; PUMPS OVER 3"" (1 TO 3 NOT TO EXCEED A TOTAL OF 300 FT); PUMPS, WELL POINTS; WELDING MAC | $60.95 | $51.00 |
| ENGI0150-026 | OPERATORPOWER EQUIPMENT, GROUP 1 (BUILDING AND RESIDENTIAL) MECHANIC; ASPHALT PLANT*; ASPHALT SPREADER; AUTOGRADE*; BACKHOES WITH CAISSON ATTACHMENT*:BATCH PLANT*; BENOTO(REQUIRES TWO ENGINEERS); BOILER AND THROTTLE VALVE; CAISSON RIGS*; CENTRAL REDI-MIX PLANT*; COMBINATION BACKHOE FRONT ENDLOADER MACHINE; COMPRESSOR AND THROTTLE VALVE; CONCRETE BREAKER (TRUCK MOUNTED)*; CONCRETE CONVEYOR; CONCRETE CONVEYOR, TRUCK MOUNTED; CONCRETE PAVER OVER 27E CU. FT.*; CONCRETE PAVER 27E CU FT AND UNDER*; CONCRETE P | $64.80 | $51.00 |
| ENGI0150-026 | OPERATORPOWER EQUIPMENT, GROUP 2 (BUILDING AND RESIDENTIAL) BOBCAT (OVER 3/4 CU YD); BOILERS; BRICK FORKLIFT; BROOM, POWER PROPELLED; BULLDOZERS; CONCRETE MIXER (TWO BAG AND OVER); CONVEYOR, PORTABLE; FORKLIFT TRUCKS; GREASER ENGINEER; HIGHLIFT SHOVELS OR FRONT END LOADERS UNDER 2 1/4 CU YD; AOTOMATIC HOISTS, HOISTS, INSIDE ELEVATORS; HOISTS, SEWER DRAGGING MACHINE; HOISTS, TUGGER SINGLE DRUM; LASER SCREED; ROCK DRILL (SELF-PROPELLED); ROCK DRILL (TRUCK MOUNTED)*; ROLLERS; STEAM GENERATORS; TRACTORS; TR | $63.50 | $51.00 |
| PAIN0014-002 | PAINTERBRUSH, DECORATOR, AND PAPERHANGER (GRUNDY, LAKE, AND WILL COUNTIES) | $53.05 | $33.91 |
| PAIN0030-001 | PAINTERBRUSH, DRYWALL TAPER/FINISHER, SANDBLASTER, AND SPRAY (DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES) | $53.05 | $27.63 |
| PLUM0597-001 | PIPEFITTER(DUPAGE (ARGONNE NATIONAL LABORATORIES, AND FERMI NATIONAL LABORATORY), GRUNDY, LAKE, MCHENRY & WILL COUNTIES) | $55.00 | $38.62 |
| PLAS0005-003 | PLASTERER(GRUNDY AND WILL COUNTIES) | $42.25 | $26.65 |
| PLAS0005-006 | PLASTERER(DU PAGE COUNTY) | $42.25 | $26.65 |
| PLAS0011-014 | PLASTERER(LAKE COUNTY) | $49.65 | $42.17 |
| PLUM0093-001 | PLUMBER(LAKE AND MCHENRY COUNTIES) | $45.76 | $26.92 |
| PLUM0130-002 | PLUMBER(DUPAGE (ARGONNE NATIONAL LABORATORIES AND FERMI NATIONAL LABORATORY), GRUNDY & WILL COUNTIES) | $60.50 | $39.02 |
| PLUM0501-001 | PLUMBER/PIPEFITTER(DUPAGE (EXCLUDING ARGONNE NATIONAL LABORATORY AND FERMI NATIONAL LABORATORY), KANE, AND KENDALL (EXCEPT THE MICH-WIS PUMPING STATION IN MILBROOK, SILICAS AND PLANT AND VILLAGE OF NEWARK, EXCLUDES YORKVILLE) COUNTIES) | $41.20 | $29.15 |
| ROOF0011-004 | ROOFER(DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | $50.25 | $30.43 |
| ROOF0011-009 | ROOFER | $38.50 | $27.23 |
| SHEE0073-003 | SHEET METAL WORKER(LAKE COUNTY) | $49.10 | $42.91 |
| SHEE0073-004 | SHEET METAL WORKERALUMINUM GUTTER WORK (LAKE COUNTY) | $31.32 | $37.02 |
| SHEE0265-001 | SHEET METAL WORKER(DU PAGE, GRUNDY, KANE, KENDALL, MCHENRY, AND WILL COUNTIES) | $56.35 | $38.65 |
| SFIL0281-002 | SPRINKLER FITTER(DUPAGE, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES) | $63.25 | $36.50 |
| BRIL0021-008 | TERRAZZO WORKER/SETTER | $48.38 | $30.79 |
| BRIL0021-008 | TILE FINISHER | $42.80 | $26.97 |
| BRIL0021-008 | TILE SETTER | $49.75 | $30.79 |
| TEAM0179-001 | TRUCK DRIVER2 OR 3 AXLE TRUCKS (GRUNDY, KENDALL, AND WILL COUNTIES) FOOTNOTES: A | $46.12 | $0.30 |
| TEAM0179-001 | TRUCK DRIVER4 AXLE TRUCKS (GRUNDY, KENDALL, AND WILL COUNTIES) FOOTNOTES: A | $448.80 | HEALTH & |
| TEAM0179-001 | TRUCK DRIVER5 AXLE TRUCKS (GRUNDY, KENDALL, AND WILL COUNTIES) FOOTNOTES: A | $448.80 | HEALTH & |
| TEAM0179-001 | TRUCK DRIVER6 AXLE TRUCKS (GRUNDY, KENDALL, AND WILL COUNTIES) FOOTNOTES: A | $448.80 | HEALTH & |
| TEAM0673-003 | TRUCK DRIVER5 AXLES (DU PAGE AND KANE COUNTIES) FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: $589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEAR | $45.66 | $0.30 |
| TEAM0673-003 | TRUCK DRIVER6 AXLES (DU PAGE AND KANE COUNTIES) FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: $589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEAR | $45.86 | $0.30 |
| TEAM0673-003 | TRUCK DRIVER2-3 AXLES (DU PAGE AND KANE COUNTIES) FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: $589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YE | $45.31 | $0.30 |
| TEAM0673-003 | TRUCK DRIVER4 AXLES (DU PAGE AND KANE COUNTIES) FOOTNOTE: A. AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES. LOW-BOY IS AN ADDITIONAL $1.50 PER HOUR HEALTH AND WELFARE: $453.20 PER WEEK PENSON: $589.90 PER WEEK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY. 900 STRAIGHT TIME HOURS OR MORE IN 1 CALENDAR YEAR FOR THE SAME EMPLOYER SHALL RECEIVE 1 WEEK PAID VACATION; 3 YEARS - 2 WEEKS PAID VACATION; 10 YEAR | $45.46 | $0.30 |
| TEAM0179-001 | WELFARE PER WEEK, $562.80 PENSION PER WEEK. B. LOWBOY IS AN ADDITIONAL $1.50PER HOUR AN ADDITIONAL $.20 PER AXLE SHALL BE PAID FOR ALL VEHICLES WITH MORE THAN SIX (6) AXLES | $46.67 | $0.30 |