Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 2 counties in Idaho: Franklin, Power. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUID2013-026 | CARPENTER(FORM WORK ONLY) | $26.24 | $9.48 |
| SUID2013-026 | CARPENTER, EXCLUDES FORM WORK | $23.92 | $9.84 |
| SUID2013-026 | CEMENT MASON/CONCRETE FINISHER | $22.90 | $11.99 |
| SUID2013-026 | ELECTRICIAN | $26.33 | $11.45 |
| SUID2013-026 | HIGHWAY/PARKING LOT STRIPINGPAINTER | $25.47 | $9.52 |
| LABO0238-035 | LABORERPIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $13.00 |
| SUID2013-026 | LABORERMASON TENDER - CEMENT/CONCRETE | $22.34 | $10.90 |
| SUID2013-026 | LABORERGRADE CHECKER | $20.64 | $7.37 |
| SUID2013-026 | LABORERCOMMON OR GENERAL | $19.18 | $7.65 |
| SUID2013-026 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.38 | $7.65 |
| SUID2013-026 | OPERATORFORKLIFT | $23.13 | $9.17 |
| SUID2013-026 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.24 | $7.12 |
| SUID2013-026 | OPERATORROLLER | $24.26 | $8.14 |
| SUID2013-026 | OPERATORROLLER (SUBGRADE) | $19.99 | $7.99 |
| SUID2013-026 | OPERATORSCREED | $22.30 | $7.22 |
| SUID2013-026 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 |
| SUID2013-026 | OPERATORBROOM/SWEEPER | $22.80 | $7.47 |
| SUID2013-026 | OPERATORCRANE | $23.34 | $9.45 |
| SUID2013-026 | OPERATOROILER | $22.25 | $6.52 |
| ENGI0370-044 | POWER EQUIPMENT OPERATORGROUP 4 FRONT END LOADER (UP TO 4YD) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. | $36.64 | $16.10 |
| ENGI0370-044 | POWER EQUIPMENT OPERATORGROUP 5 ELEVATING GRADER OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (UNDER 3/4 YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUC | $36.81 | $16.10 |
| ENGI0370-044 | POWER EQUIPMENT OPERATOR(GROUP 6): BLADE OPERATOR, BACKHOE/TRACKHOE/EXCAVATOR (3/4 YDS- 3 1/2 YDS, FRONT END LOADER (OVER 4 YDS TO AND INCLUDING 7YDS) ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. | $36.98 | $16.10 |
| ENGI0370-044 | POWER EQUIPMENT OPERATORGROUP 7 GRADER (FINE), FRONT END LOADER (OVER 7 YDS), HEAVY DUTY MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 1 | $37.35 | $16.10 |
| ENGI0370-044 | POWER EQUIPMENT OPERATORGROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. | $37.58 | $16.10 |
| SUID2013-026 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $17.69 | $4.66 |
| SUID2013-026 | TRUCK DRIVERDUMP TRUCK | $21.50 | $10.91 |
| SUID2013-026 | TRUCK DRIVERLOWBOY TRUCK | $26.61 | $13.21 |
| SUID2013-026 | TRUCK DRIVEROIL DISTRIBUTOR TRUCK | $23.93 | $11.27 |
| SUID2013-026 | TRUCK DRIVERWATER TRUCK | $21.54 | $12.19 |