Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Idaho: Nez Perce. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUID2013-025 | CARPENTER(FORM WORK ONLY) | $26.24 | $9.48 |
| SUID2013-025 | CARPENTER, EXCLUDES FORM WORK | $23.92 | $9.75 |
| PLAS0072-001 | CEMENT MASON/CONCRETE FINISHER(ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 |
| SUID2013-025 | ELECTRICIAN | $26.97 | $12.10 |
| SUID2013-025 | HIGHWAY/PARKING LOT STRIPINGPAINTER | $25.47 | $9.52 |
| LABO0238-035 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $28.48 |
| $13.00 |
| SUID2013-025 | LABORERGRADE CHECKER | $20.64 | $7.37 |
| SUID2013-025 | LABORERMASON TENDER - CEMENT/CONCRETE | $23.36 | $10.14 |
| SUID2013-025 | LABORERCOMMON OR GENERAL | $22.86 | $10.32 |
| SUID2013-025 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.40 | $9.72 |
| SUID2013-025 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.80 | $11.56 |
| SUID2013-025 | OPERATORROLLER | $25.04 | $11.68 |
| SUID2013-025 | OPERATORROLLER (FINISHING) | $25.77 | $11.72 |
| SUID2013-025 | OPERATORSCREED | $25.89 | $11.70 |
| SUID2013-025 | OPERATORROLLER (SUBGRADE) | $19.99 | $7.99 |
| SUID2013-025 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $25.60 | $11.61 |
| SUID2013-025 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $25.18 | $11.55 |
| SUID2013-025 | OPERATORBROOM/SWEEPER | $23.34 | $8.48 |
| SUID2013-025 | OPERATORCRANE | $23.53 | $9.55 |
| SUID2013-025 | OPERATORFORKLIFT | $23.13 | $9.17 |
| SUID2013-025 | OPERATORGRADER/BLADE | $26.06 | $11.66 |
| SUID2013-025 | OPERATORLOADER | $26.06 | $11.74 |
| SUID2013-025 | OPERATORMECHANIC | $23.55 | $8.54 |
| SUID2013-025 | OPERATOROILER | $22.25 | $6.52 |
| ENGI0302-014 | POWER EQUIPMENT OPERATORGROUP 6 BULLDOZER ZONE PAY: ZONE 1 0 - 45 MILES: FREE ZONE 2 45 MILES AND OVER: +$2.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: SPOKANE PASCO LEWISTON | $40.05 | $23.40 |
| SUID2013-025 | TRAFFIC CONTROLFLAGGER | $20.76 | $9.40 |
| SUID2013-025 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $21.64 | $9.40 |
| SUID2013-025 | TRUCK DRIVERDUMP TRUCK | $23.46 | $12.12 |
| SUID2013-025 | TRUCK DRIVERLOWBOY TRUCK | $26.61 | $13.21 |
| SUID2013-025 | TRUCK DRIVEROIL DISTRIBUTOR TRUCK | $23.93 | $11.27 |
| SUID2013-025 | TRUCK DRIVERWATER TRUCK | $23.15 | $11.77 |