Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Idaho: Bonner. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUID2013-003 | CARPENTER(FORM WORK ONLY) | $26.57 | $8.10 |
| PLAS0072-001 | CEMENT MASON/CONCRETE FINISHER(ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 |
| SUID2013-003 | ELECTRICIAN | $26.83 | $11.94 |
| SUID2013-003 | HIGHWAY/PARKING LOT STRIPINGPAINTER | $23.80 | $6.67 |
| LABO0238-013 | LABORERMASON TENDER (CEMENT/CONCRETE) | $28.21 | $13.00 |
| SUID2013-003 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABORERCOMMON OR GENERAL |
| $22.67 |
| $9.81 |
| SUID2013-003 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 |
| SUID2013-003 | LABORERGRADE CHECKER | $23.41 | $10.78 |
| SUID2013-003 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $22.86 | $9.40 |
| SUID2013-003 | OPERATORHYDROSEEDER | $24.76 | $11.51 |
| SUID2013-003 | OPERATORLOADER | $25.76 | $10.31 |
| SUID2013-003 | OPERATORMECHANIC | $26.00 | $9.93 |
| SUID2013-003 | OPERATOROILER | $25.66 | $9.23 |
| SUID2013-003 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.66 | $11.03 |
| SUID2013-003 | OPERATORROLLER (SUBGRADE) | $22.24 | $8.57 |
| SUID2013-003 | OPERATORROLLER | $25.49 | $11.55 |
| SUID2013-003 | OPERATORROTOMILL | $29.78 | $4.52 |
| SUID2013-003 | OPERATORSCREED | $25.71 | $11.55 |
| SUID2013-003 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 |
| SUID2013-003 | OPERATORBROOM/SWEEPER | $26.82 | $11.55 |
| SUID2013-003 | OPERATORBULLDOZER | $25.73 | $11.51 |
| SUID2013-003 | OPERATORCRANE | $27.18 | $10.97 |
| SUID2013-003 | OPERATORCRUSHER | $25.06 | $9.23 |
| SUID2013-003 | OPERATORGRADER/BLADE | $26.00 | $10.30 |
| ENGI0370-045 | POWER EQUIPMENT OPERATORGROUP 5 BACKHOE/EXCAVATOR/TRACKHOE (45,000 GW & UNDER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.76 | $15.95 |
| ENGI0370-045 | POWER EQUIPMENT OPERATORGROUP 6 BACKHOE/EXCAVATOR/TRACKHOE (45,000-110,000 GW) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $29.04 | $15.95 |
| ENGI0370-045 | POWER EQUIPMENT OPERATORGROUP 7 BACKHOE/EXCAVATOR/TRACKHOE (OVER 110,000 GW) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $29.31 | $15.95 |
| SUID2013-003 | TRAFFIC CONTROLFLAGGER | $21.46 | $10.12 |
| SUID2013-003 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 |
| SUID2013-003 | TRUCK DRIVERDUMP TRUCK | $23.40 | $10.75 |
| SUID2013-003 | TRUCK DRIVERLOWBOY TRUCK | $22.12 | $13.20 |
| SUID2013-003 | TRUCK DRIVEROIL DISTRIBUTOR TRUCK | $22.54 | $12.35 |
| SUID2013-003 | TRUCK DRIVERWATER TRUCK | $23.12 | $10.75 |