Revision 2 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Idaho: Blaine. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUID2013-002 | CARPENTER(FORM WORK ONLY) | $26.57 | $8.10 |
| PLAS0072-001 | CEMENT MASON/CONCRETE FINISHER(ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 |
| ELEC0449-001 | ELECTRICIAN | $40.00 | $18.74 |
| SUID2013-002 | HIGHWAY/PARKING LOT STRIPINGPAINTER | $26.38 | $7.89 |
| SUID2013-002 | LABORERMASON TENDER - CEMENT/CONCRETE | $23.69 | $10.97 |
| SUID2013-002 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABORERGRADE CHECKER |
| $23.45 |
| $10.97 |
| SUID2013-002 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.13 | $11.01 |
| SUID2013-002 | LABORERCOMMON OR GENERAL | $22.68 | $10.90 |
| SUID2013-002 | LABORERCONCRETE SAW (HAND HELD/WALK BEHIND) | $23.98 | $11.05 |
| SUID2013-002 | OPERATORGRADER/BLADE | $26.14 | $10.69 |
| SUID2013-002 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $25.80 | $10.00 |
| SUID2013-002 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $25.35 | $11.55 |
| SUID2013-002 | OPERATORBROOM/SWEEPER | $25.01 | $10.16 |
| SUID2013-002 | OPERATORBULLDOZER | $26.19 | $9.60 |
| SUID2013-002 | OPERATORCRANE | $26.04 | $10.00 |
| SUID2013-002 | OPERATORCRUSHER | $25.06 | $9.23 |
| SUID2013-002 | OPERATORHYDROSEEDER | $24.76 | $11.51 |
| SUID2013-002 | OPERATORLOADER | $25.78 | $10.17 |
| SUID2013-002 | OPERATOROILER | $25.66 | $9.23 |
| SUID2013-002 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.95 | $10.64 |
| SUID2013-002 | OPERATORROLLER | $25.47 | $10.32 |
| SUID2013-002 | OPERATORROLLER (SUBGRADE) | $22.24 | $8.57 |
| SUID2013-002 | OPERATORROTOMILL | $26.54 | $10.00 |
| SUID2013-002 | OPERATORSCREED | $25.63 | $10.34 |
| ENGI0302-015 | POWER EQUIPMENT OPERATORGROUP 7 MECHANIC ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | $37.35 | $16.10 |
| SUID2013-002 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $22.66 | $10.90 |
| SUID2013-002 | TRAFFIC CONTROLFLAGGER | $22.68 | $10.90 |
| SUID2013-002 | TRUCK DRIVERDUMP TRUCK | $21.74 | $13.95 |
| SUID2013-002 | TRUCK DRIVERLOWBOY TRUCK | $21.53 | $12.98 |
| SUID2013-002 | TRUCK DRIVEROIL DISTRIBUTOR TRUCK | $22.54 | $12.35 |
| SUID2013-002 | TRUCK DRIVERWATER TRUCK | $21.61 | $13.05 |