Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 2 counties in Idaho: Idaho, Lewis. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUID2010-017 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $20.13 | $1.80 |
| BOIL0004-003 | BOILERMAKER(IDAHO COUNTY) | $44.37 | $26.87 |
| BOIL0242-003 | BOILERMAKER(LEWIS COUNTY ONLY) | $47.67 | $28.38 |
| BRID0003-001 | BRICKLAYER | $32.05 | $18.27 |
| CARP0001-043 | CARPENTERINCLUDES FORM WORK AND SCAFFOLD BUILDING, EXCLUDES ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING (LEWIS AND PART OF IDAHO COUNTY N. OF 46TH PARALLEL) | $38.87 | $17.84 |
| CARP0808-002 | CARPENTERINCLUDES FORM WORK AND SCAFFOLD BUILDING, EXCLUDES ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING (AREA SOUTH OF THE 46TH PARALLEL IN IDAHO COUNTY) ZONE PAY: ZONE 1 0-30 MILES: FREE ZONE 2 MORE THAN 30-60 MILES: $2.00/PER HOUR ZONE 3 MORE THAN 60 MILES: $3.00/PER HOUR IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDA |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $33.12 |
| $15.94 |
| SUID2010-017 | CARPENTER(ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING ONLY) | $24.69 | $1.62 |
| PLAS0072-002 | CEMENT MASON/CONCRETE FINISHER(ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 |
| SUID2010-017 | DRYWALL FINISHER/TAPER | $20.27 | $3.50 |
| ELEC0073-012 | ELECTRICIAN | $49.55 | $19.09 |
| ELEV0019-006 | ELEVATOR MECHANIC A. VACATIONEMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $67.61 | $38.44 |
| IRON0014-003 | IRONWORKERREINFORCING AND STRUCTURAL | $43.40 | $30.27 |
| LABO0238-011 | LABORERCOMMON OR GENERAL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $32.15 | $16.30 |
| LABO0238-012 | LABORER(MASON TENDER (CEMENT/CONCRETE, BRICK (HOD)) | $26.84 | $12.35 |
| SUID2010-017 | LABORERCARPENTER TENDER | $17.71 | $1.82 |
| SUID2010-017 | OPERATORCRANE | $27.29 | $10.53 |
| SUID2010-017 | OPERATORBACKHOE/EXCAVATOR | $20.75 | $4.42 |
| SUID2010-017 | PAINTERBRUSH, ROLLER AND SPRAY | $19.31 | $4.41 |
| PLUM0044-006 | PLUMBER(LEWIS COUNTY AND AREA N OF 46TH PARALLEL IN IDAHO COUNTY) | $44.57 | $26.58 |
| PLUM0296-011 | PLUMBER(IDAHO COUNTY, S. OF 46TH PARALLEL) | $39.90 | $18.67 |
| ROOF0189-002 | ROOFER | $35.75 | $15.21 |
| SHEE0055-001 | SHEET METAL WORKERINCLUDES HVAC DUCT INSTALLATION (IDAHO COUNTY ONLY) | $39.20 | $23.59 |
| SHEE0055-003 | SHEET METAL WORKERINCLUDES HVAC DUCT INSTALLATION (LEWIS COUNTY) | $39.00 | $22.42 |
| SUID2010-017 | TRUCK DRIVERDUMP TRUCK | $17.82 | $2.18 |