Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Idaho: Shoshone. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRID0003-001 | BRICKLAYER | $32.05 | $18.27 |
| CARP0001-046 | CARPENTER(INCLUDES FORM WORK AND SCAFFOLD BUILDING) | $33.41 | $17.84 |
| SUID2010-011 | CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) | $18.13 | $4.39 |
| SUID2010-011 | CARPENTER(DRYWALL HANGING ONLY) | $20.77 | $4.19 |
| SUID2010-011 | CEMENT MASON/CONCRETE FINISHER | $26.08 | $9.93 |
| SUID2010-011 | DRYWALL FINISHER/TAPER | $22.78 | $8.88 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUID2010-011 |
| ELECTRICIAN |
| $23.65 |
| $0.00 |
| ELEV0019-006 | ELEVATOR MECHANIC A. VACATIONEMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $67.61 | $38.44 |
| SUID2010-011 | INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 |
| IRON0014-003 | IRONWORKERREINFORCING AND STRUCTURAL | $43.40 | $30.27 |
| LABO0238-012 | LABORER(MASON TENDER (CEMENT/CONCRETE, BRICK (HOD)) | $26.84 | $12.35 |
| SUID2010-011 | LABORERCOMMON OR GENERAL | $17.17 | $0.00 |
| SUID2010-011 | LABORERCARPENTER TENDER | $17.71 | $1.82 |
| SUID2010-011 | OPERATORBACKHOE/EXCAVATOR | $20.75 | $4.42 |
| SUID2010-011 | OPERATORCRANE | $27.29 | $10.53 |
| SUID2010-011 | PAINTERBRUSH, ROLLER AND SPRAY | $19.31 | $4.41 |
| PLUM0044-005 | PLUMBER(ZONE 1) | $44.57 | $26.58 |
| ROOF0189-002 | ROOFER | $35.75 | $15.21 |
| SHEE0055-002 | SHEET METAL WORKER(INCLUDES HVAC DUCT INSTALLATION) | $39.00 | $22.42 |
| SUID2010-011 | TRUCK DRIVERDUMP TRUCK | $17.82 | $2.18 |