Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Idaho: Minidoka. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRID0003-002 | BRICKLAYER | $30.00 | $17.78 |
| SUID2010-010 | CARPENTER, EXCLUDES FORM WORK | $21.44 | $0.00 |
| SUID2010-010 | CEMENT MASON/CONCRETE FINISHER | $14.76 | $2.80 |
| ELEC0449-003 | ELECTRICIAN | $40.00 | $18.74 |
| SUID2010-010 | HVAC MECHANICDUCT INSTALLATION | $23.63 | $6.63 |
| SUID2010-010 | INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 |
| IRON0732-002 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRONWORKER, STRUCTURAL |
| $33.37 |
| $22.98 |
| LABO0155-004 | LABORERMASON TENDER-CEMENT/CONCRETE | $33.93 | $16.50 |
| SUID2010-010 | LABORERCOMMON OR GENERAL | $14.82 | $0.00 |
| SUID2010-010 | LABORERTAMPER (HAND HELD) | $15.00 | $5.00 |
| SUID2010-010 | LABORERPIPELAYER | $14.26 | $0.00 |
| SUID2010-010 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $18.96 | $4.42 |
| SUID2010-010 | OPERATORCRANE | $27.29 | $10.53 |
| SUID2010-010 | PAINTERBRUSH, ROLLER AND SPRAY | $16.12 | $0.00 |
| PLUM0648-004 | PLUMBER | $36.75 | $18.93 |
| ROOF0200-002 | ROOFER | $29.02 | $19.90 |
| SHEE0055-005 | SHEET METAL WORKER(EXCLUDES HVAC DUCT INSTALLATION) | $39.20 | $23.59 |
| SUID2010-010 | TRUCK DRIVERDUMP TRUCK | $17.82 | $2.18 |
| TEAM0483-002 | TRUCK DRIVERGROUP 3 WATER TRUCK | $35.00 | $17.00 |