Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Idaho: Madison. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRID0003-002 | BRICKLAYER | $30.00 | $17.78 |
| SUID2010-009 | CARPENTER | $18.37 | $3.09 |
| SUID2010-009 | CEMENT MASON/CONCRETE FINISHER | $14.76 | $2.80 |
| ELEC0449-007 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING) | $40.00 | $18.74 |
| SUID2010-009 | INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 |
| IRON0732-002 | IRONWORKER, STRUCTURAL | $33.37 | $22.98 |
| LABO0155-004 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABORERMASON TENDER-CEMENT/CONCRETE |
| $33.93 |
| $16.50 |
| SUID2010-009 | LABORERCOMMON OR GENERAL | $11.10 | $2.90 |
| SUID2010-009 | PAINTERBRUSH, ROLLER AND SPRAY | $16.12 | $0.00 |
| PLUM0648-004 | PLUMBER | $36.75 | $18.93 |
| ENGI0302-033 | POWER EQUIPMENT OPERATORGROUP 3 FORKLIFT ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.33 | $16.10 |
| ENGI0302-033 | POWER EQUIPMENT OPERATORGROUP 5 BACKHOE (UP TO 3/4 YD), INDUSTRIAL OILER ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY | $36.81 | $16.10 |
| ENGI0302-033 | POWER EQUIPMENT OPERATORGROUP 6 BACKHOE (3/4 YD TO 3 1/2 YD), CRANE (UP TO AND INCLUDING 50 TON) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES: $35.00/PER DAY. CRANE LONG BOOM PAY: A. CRANE BOOMS, 100FT TO 150FT, FIFTEEN CENTS OVER SCALE B. CRANE BOOMS, 150 FT TO 200 FT, THIRTY CENTS OVER SCALE C. CRANE BOOMS, OVER 200 FT., FORTY-FIVE CENTS OVER SCALE | $36.98 | $16.10 |
| ENGI0302-033 | POWER EQUIPMENT OPERATORGROUP 7 EXCAVATOR, CRANE (OVER 50 TONS), TOWER CRANE, HEAVY DUTY MECHANIC ZONE 1 (ANYONE WORKING ON HAZMAT JOBS WORKING WITH SUPPLIED AIR SHALL RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION) ZONE PAY: ZONE CENTERS: BOISE, TWIN FALLS, POCATELLO, AND IDAHO FALLS ZONE 1 0 - 30 MILES: FREE Zone 2 30 - 60 miles: $30.00/per day Zone 3 More than 60 miles: $35.00/per day. CRANE LONG BOOM PAY: A. Crane Booms, 100ft to 150ft, fifteen cents over scale B. Crane Booms, 150 ft to 200 ft, thirty cents over scale | $37.35 | $16.10 |
| ROOF0200-002 | ROOFER | $29.02 | $19.90 |
| SHEE0103-003 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $35.50 | $22.25 |
| SUID2010-009 | SPRINKLER FITTER(FIRE SPRINKLERS) | $26.80 | $12.00 |
| TEAM0983-001 | TRUCK DRIVER, GROUP 5A DUMP(0-16 YDS) | $35.60 | $17.00 |
| TEAM0983-001 | TRUCK DRIVER, GROUP 5B DUMP(16-30 YDS) | $35.78 | $17.00 |
| TEAM0983-001 | TRUCK DRIVER, GROUP 5C DUMP(30-50 YDS) | $36.01 | $17.00 |
| TEAM0983-001 | TRUCK DRIVER, GROUP 5D DUMP(50-75 YDS) | $36.12 | $17.00 |
| TEAM0983-001 | TRUCK DRIVER, GROUP 5E DUMP(75-100 YDS) | $36.75 | $17.00 |
| TEAM0983-001 | TRUCK DRIVER, GROUP 5F DUMP(OVER 100 YDS) | $37.19 | $17.00 |