Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Idaho: Benewah. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0242-001 | BOILERMAKER | $47.67 | $28.38 |
| BRID0003-001 | BRICKLAYER | $32.05 | $18.27 |
| CARP0001-001 | CARPENTER(INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK AND SCAFFOLD BUILDING) | $38.87 | $17.84 |
| PLAS0072-002 | CEMENT MASON/CONCRETE FINISHER(ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 |
| ELEC0073-006 | ELECTRICIAN | $49.55 | $19.09 |
| ELEV0019-006 | ELEVATOR MECHANIC A. VACATION |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $67.61 |
| $38.44 |
| IRON0014-003 | IRONWORKERREINFORCING AND STRUCTURAL | $43.40 | $30.27 |
| LABO0238-011 | LABORERCOMMON OR GENERAL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $32.15 | $16.30 |
| LABO0238-012 | LABORER(MASON TENDER (CEMENT/CONCRETE, BRICK (HOD)) | $26.84 | $12.35 |
| PLUM0044-005 | PLUMBER(ZONE 1) | $44.57 | $26.58 |
| ROOF0189-002 | ROOFER | $35.75 | $15.21 |
| SHEE0055-002 | SHEET METAL WORKER(INCLUDES HVAC DUCT INSTALLATION) | $39.00 | $22.42 |