Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Iowa: Woodbury. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0083-009 | BOILERMAKER | $48.48 | $33.91 |
| BRIA0003-007 | BRICKLAYER | $29.80 | $17.16 |
| CARP0948-003 | CARPENTER(INCLUDES DRYWALL HANGING) | $30.72 | $19.43 |
| PLAS0018-015 | CEMENT MASON/CONCRETE FINISHER | $32.29 | $28.45 |
| SUIA2016-052 | DRYWALL FINISHER/TAPER | $18.70 | $5.53 |
| ELEC0231-010 | ELECTRICIAN | $40.68 | $16.95 |
| ELEV0033-002 | ELEVATOR MECHANIC FOOTNOTESA. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $56.30 |
| $38.44 |
| SUIA2016-052 | INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $23.50 | $8.25 |
| IRON0021-013 | IRONWORKERSTRUCTURAL | $32.14 | $15.91 |
| IRON0089-003 | IRONWORKERORNAMENTAL | $35.53 | $24.45 |
| IRON0111-002 | IRONWORKERREINFORCING | $37.50 | $30.99 |
| LABO0620-001 | LABORER(COMMON OR GENERAL) | $20.40 | $16.20 |
| SUIA2016-052 | LABORERPIPELAYER | $16.11 | $0.00 |
| SUIA2016-052 | LABORERMASON TENDER - BRICK | $14.57 | $0.00 |
| SUIA2016-052 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $17.41 | $0.00 |
| SUIA2016-052 | OPERATORFORKLIFT | $22.96 | $7.49 |
| SUIA2016-052 | OPERATORCRANE | $24.20 | $9.62 |
| SUIA2016-052 | PAINTERSPRAY | $19.77 | $6.64 |
| SUIA2016-052 | PAINTER(BRUSH AND ROLLER) | $21.35 | $8.54 |
| PLUM0033-011 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION) | $43.20 | $23.25 |
| PLUM0033-028 | PLUMBER | $45.20 | $23.25 |
| ENGI0234-022 | POWER EQUIPMENT OPERATOR(CLASS 3)- BOBCAT/SKID STEER/SKID LOADER, LOADER(UNDER 35 H.P.) WITH OR WITHOUT ATTACHMENTS, PAVER(ALL TYPES), ROLLER ) | $31.44 | $18.35 |
| ENGI0234-022 | POWER EQUIPMENT OPERATOR(CLASS 2)- BULLDOZER, LOADER | $32.99 | $18.35 |
| SUIA2016-052 | ROOFER | $20.11 | $4.99 |
| SUIA2016-052 | SHEET METAL WORKER, INCLUDES HVAC DUCT, AND HVAC UNIT INSTALLATION | $22.13 | $6.00 |