Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Iowa: Scott. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0081-001 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $24.35 |
| BOIL0083-009 | BOILERMAKER | $48.48 | $33.91 |
| BRIA0003-029 | BRICKLAYER | $35.53 | $24.32 |
| CARP0004-012 | CARPENTER(INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK) | $34.25 | $29.53 |
| PLAS0018-015 | CEMENT MASON/CONCRETE FINISHER | $32.29 | $28.45 |
| PAIN0676-003 | DRYWALL FINISHER/TAPER | $31.82 | $19.05 |
| ELEC0145-009 | ELECTRICIAN |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $46.00 |
| $28.56 |
| ELEV0033-002 | ELEVATOR MECHANIC FOOTNOTESA. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $56.30 | $38.44 |
| IRON0089-003 | IRONWORKERORNAMENTAL | $35.53 | $24.45 |
| IRON0111-009 | IRONWORKER(REINFORCING AND STRUCTURAL) | $37.50 | $30.99 |
| LABO0309-014 | LABORERPIPELAYER | $31.56 | $24.10 |
| LABO0309-014 | LABORERCOMMON OR GENERAL | $30.06 | $24.10 |
| SUIA2016-048 | LABORERMASON TENDER - BRICK | $19.39 | $8.17 |
| SUIA2016-048 | OPERATORFORKLIFT | $22.96 | $7.49 |
| SUIA2016-048 | OPERATORBULLDOZER | $26.13 | $13.56 |
| SUIA2016-048 | OPERATORCRANE | $24.15 | $8.10 |
| PAIN0676-003 | PAINTERBRUSH AND ROLLER ONLY | $31.32 | $19.05 |
| SUIA2016-048 | PAINTERSPRAY | $18.61 | $0.00 |
| PLUM0025-004 | PIPEFITTER(INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $46.10 | $27.05 |
| PLAS0018-017 | PLASTERER | $32.29 | $28.45 |
| PLUM0025-006 | PLUMBER | $46.10 | $27.05 |
| ENGI0150-038 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $41.50 | $41.25 |
| ENGI0150-041 | POWER EQUIPMENT OPERATORBOBCAT/SKID STEER/SKID LOADER | $37.80 | $41.25 |
| ENGI0150-053 | POWER EQUIPMENT OPERATORLOADER; PAVER(ALL TYPES); ROLLER | $41.50 | $41.25 |
| SUIA2016-048 | ROOFER | $21.92 | $5.07 |
| SUIA2016-048 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $27.72 | $13.18 |
| BRIA0003-006 | TILE SETTER | $32.80 | $20.25 |