Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Iowa: Linn. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0081-001 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $36.06 | $24.35 |
| BOIL0083-009 | BOILERMAKER | $48.48 | $33.91 |
| BRIA0003-002 | BRICKLAYER | $36.00 | $17.79 |
| CARP0308-003 | CARPENTER(INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $31.17 | $24.15 |
| SUIA2016-044 | CEMENT MASON/CONCRETE FINISHER | $21.66 | $2.47 |
| SUIA2016-044 | ELECTRICIAN | $28.85 | $10.43 |
| ELEV0033-002 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEVATOR MECHANIC FOOTNOTESA. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY |
| $56.30 |
| $38.44 |
| SUIA2016-044 | FLOOR LAYERFLOOR COATING/EPOXY | $22.43 | $0.00 |
| IRON0089-002 | IRONWORKERSTRUCTURAL | $35.53 | $24.45 |
| IRON0089-002 | IRONWORKERORNAMENTAL | $35.53 | $24.45 |
| IRON0111-002 | IRONWORKERREINFORCING | $37.50 | $30.99 |
| LABO0043-004 | LABORER(COMMON OR GENERAL) | $28.33 | $19.82 |
| LABO0043-015 | LABORERPIPELAYER | $28.33 | $19.82 |
| SUIA2016-044 | LABORERMASON TENDER - BRICK | $19.39 | $8.17 |
| CARP2158-004 | MILLWRIGHT | $36.70 | $28.95 |
| SUIA2016-044 | OPERATORCRANE | $24.15 | $8.10 |
| SUIA2016-044 | OPERATORFORKLIFT | $22.96 | $7.49 |
| SUIA2016-044 | OPERATORBULLDOZER | $26.13 | $13.56 |
| PAIN0447-004 | PAINTER(BRUSH AND ROLLER) | $29.55 | $12.10 |
| PAIN0447-004 | PAINTERSPRAY | $29.55 | $12.10 |
| PLUM0125-003 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION) | $45.51 | $21.57 |
| PLUM0125-004 | PLUMBER | $45.51 | $21.57 |
| ENGI0234-003 | POWER EQUIPMENT OPERATORPAVER(ALL TYPES), ROLLER | $35.29 | $18.35 |
| ENGI0234-003 | POWER EQUIPMENT OPERATORLOADER | $37.62 | $18.35 |
| ENGI0234-003 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $39.00 | $18.35 |
| SUIA2016-044 | ROOFER | $21.92 | $5.07 |
| SHEE0263-007 | SHEET METAL WORKER(INCLUDES HVAC DUCT AND UNIT INSTALLATION) | $41.45 | $23.11 |
| SFIA0669-002 | SPRINKLER FITTER(FIRE SPRINKLERS) | $45.99 | $26.42 |
| BRIA0003-019 | TILE SETTER | $36.00 | $17.79 |