Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Iowa: Harrison. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0039-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.26 | $20.54 |
| BOIL0083-009 | BOILERMAKER | $48.48 | $33.91 |
| BRIA0003-016 | BRICKLAYER | $34.80 | $19.24 |
| SUIA2016-042 | CARPENTER | $21.61 | $9.92 |
| PLAS0018-015 | CEMENT MASON/CONCRETE FINISHER | $32.29 | $28.45 |
| ELEC0022-004 | ELECTRICIAN | $46.40 | $20.89 |
| ELEV0028-002 | ELEVATOR MECHANIC FOOTNOTESA. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $55.88 |
| $38.44 |
| IRON0021-012 | IRONWORKERSTRUCTURAL | $38.82 | $17.04 |
| IRON0089-003 | IRONWORKERORNAMENTAL | $35.53 | $24.45 |
| IRON0111-002 | IRONWORKERREINFORCING | $37.50 | $30.99 |
| SUIA2016-042 | LABORERPIPELAYER | $16.11 | $0.00 |
| SUIA2016-042 | LABORERCOMMON OR GENERAL | $12.81 | $0.00 |
| SUIA2016-042 | LABORERMASON TENDER - BRICK | $14.57 | $0.00 |
| SUIA2016-042 | OPERATORCRANE | $24.20 | $9.62 |
| SUIA2016-042 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $17.41 | $0.00 |
| SUIA2016-042 | OPERATORFORKLIFT | $22.96 | $7.49 |
| SUIA2016-042 | PAINTERSPRAY | $19.77 | $6.64 |
| SUIA2016-042 | PAINTER(BRUSH AND ROLLER) | $21.35 | $8.54 |
| PLUM0033-011 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION) | $43.20 | $23.25 |
| PLUM0033-028 | PLUMBER | $45.20 | $23.25 |
| ENGI0234-014 | POWER EQUIPMENT OPERATOR(CLASS 3)- BULLDOZER, LOADER | $32.62 | $21.94 |
| ENGI0234-014 | POWER EQUIPMENT OPERATOR(CLASS 2)- BOBCAT/SKID STEER/SKID LOADER, LOADER(UNDER 35 H.P.) WITH OR WITHOUT ATTACHMENTS, PAVER(ALL TYPES), ROLLER | $34.70 | $21.94 |
| SUIA2016-042 | ROOFER | $20.11 | $4.99 |
| SUIA2016-042 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $31.07 | $9.72 |
| BRIA0003-022 | TILE SETTER | $34.80 | $19.24 |