Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Iowa: Carroll. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0083-009 | BOILERMAKER | $48.48 | $33.91 |
| BRIA0003-016 | BRICKLAYER | $34.80 | $19.24 |
| SUIA2016-008 | CARPENTER | $21.75 | $7.54 |
| PLAS0021-001 | CEMENT MASON/CONCRETE FINISHER | $34.55 | $23.83 |
| ELEC0022-007 | ELECTRICIAN(LOW VOLTAGE WIRING) | $32.97 | $15.92 |
| SUIA2016-008 | ELECTRICIAN | $26.18 | $8.33 |
| ELEV0033-002 | ELEVATOR MECHANIC FOOTNOTESA. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $56.30 |
| $38.44 |
| SUIA2016-008 | GLAZIER | $20.00 | $3.88 |
| SUIA2016-008 | INSULATORMECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $18.01 | $4.19 |
| IRON0577-001 | IRONWORKERORNAMENTAL | $36.30 | $25.80 |
| SUIA2016-008 | IRONWORKER, REINFORCING | $24.43 | $16.24 |
| SUIA2016-008 | IRONWORKER, STRUCTURAL | $23.43 | $0.00 |
| LABO0177-002 | LABORERMASON TENDER - BRICK | $29.36 | $17.99 |
| SUIA2016-008 | LABORERCOMMON OR GENERAL | $12.09 | $2.02 |
| SUIA2016-008 | LABORERPIPELAYER | $18.00 | $2.70 |
| SUIA2016-008 | OPERATORLOADER | $25.36 | $15.62 |
| SUIA2016-008 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $24.43 | $11.20 |
| SUIA2016-008 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $25.14 | $18.26 |
| SUIA2016-008 | OPERATORBULLDOZER | $22.31 | $8.36 |
| PAIN0246-001 | PAINTERBRUSH AND ROLLER | $32.41 | $16.30 |
| PLUM0033-002 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $45.20 | $23.25 |
| SUIA2016-008 | PLUMBER | $23.94 | $10.84 |
| ENGI0234-020 | POWER EQUIPMENT OPERATOR(CLASS 1)- FORKLIFT (ON STEEL ERECTION AND MACHINERY MOVING) | $33.54 | $18.35 |
| ENGI0234-020 | POWER EQUIPMENT OPERATOR(CLASS 2)- FORKLIFT (OTHER THAN THE ABOVE) | $32.99 | $18.35 |
| ENGI0234-021 | POWER EQUIPMENT OPERATORCRANE | $34.54 | $18.35 |
| SUIA2016-008 | ROOFER | $15.02 | $1.88 |
| SHEE0045-002 | SHEET METAL WORKER(INCLUDES HVAC DUCT AND UNIT INSTALLATION) | $39.38 | $24.95 |