Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Guam: Guam. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUGU2022-001 | CARPENTER | $18.03 | $0.00 |
| SUGU2022-001 | CEMENT MASON/CONCRETE FINISHER | $16.49 | $0.00 |
| SUGU2022-001 | ELECTRICIAN | $18.59 | $0.00 |
| SUGU2022-001 | FORM WORKER | $15.48 | $0.00 |
| SUGU2022-001 | HVAC MECHANICHVAC UNIT INSTALLATION | $19.36 | $1.09 |
| SUGU2022-001 | IRONWORKER, REINFORCING | $17.78 | $0.00 |
| SUGU2022-001 | IRONWORKER, STRUCTURAL | $17.09 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $0.00 |
| SUGU2022-001 | LABORERCOMMON OR GENERAL | $12.58 | $0.00 |
| SUGU2022-001 | LABORERLANDSCAPE | $13.03 | $0.00 |
| SUGU2022-001 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $18.71 | $0.00 |
| SUGU2022-001 | OPERATORCRANE | $21.30 | $0.00 |
| SUGU2022-001 | PAINTER | $15.66 | $0.00 |
| SUGU2022-001 | PLUMBER | $19.37 | $0.00 |
| SUGU2022-001 | SHEET METAL WORKER | $17.76 | $0.30 |
| SUGU2022-001 | TRUCK DRIVERDUMP TRUCK | $16.68 | $0.00 |