Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 3 counties in Georgia: Chattahoochee, Harris, Marion. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0048-003 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $33.90 | $18.80 |
| SUGA2017-035 | CARPENTER | $20.69 | $4.48 |
| SUGA2017-035 | CEMENT MASON/CONCRETE FINISHER | $13.12 | $0.00 |
| SUGA2017-035 | ELECTRICIAN | $22.45 | $12.41 |
| IRON0387-002 | IRONWORKERORNAMENTAL | $32.00 | $15.05 |
| IRON0387-002 | IRONWORKER, STRUCTURAL | $32.00 | $15.05 |
| SUGA2017-035 | LABORERPIPELAYER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $12.55 |
| $1.90 |
| SUGA2017-035 | LABORERCOMMON OR GENERAL | $10.33 | $0.00 |
| ENGI0926-005 | OPERATORCRANE | $38.53 | $16.08 |
| ENGI0926-006 | OPERATORFORKLIFT | $32.93 | $16.08 |
| SUGA2017-035 | OPERATORROLLER | $14.05 | $0.00 |
| SUGA2017-035 | OPERATORBULLDOZER | $15.23 | $0.00 |
| SUGA2017-035 | OPERATORGRADER/BLADE | $16.80 | $0.00 |
| SUGA2017-035 | OPERATORLOADER | $14.86 | $0.00 |
| SUGA2017-035 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $14.24 | $0.00 |
| SUGA2017-035 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $14.88 | $0.00 |
| SUGA2017-035 | PAINTERSPRAY | $15.67 | $0.00 |
| SUGA2017-035 | PAINTER(BRUSH AND ROLLER) | $15.33 | $0.00 |
| PLUM0072-006 | PIPEFITTER | $41.18 | $17.01 |
| PLUM0072-008 | PLUMBER | $41.18 | $17.01 |
| SHEE0085-023 | SHEET METAL WORKER | $38.29 | $17.40 |