Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 3 counties in Georgia: Catoosa, Dade, Walker. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0046-003 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.24 | $18.54 |
| SUGA2017-034 | CARPENTER | $20.69 | $4.48 |
| SUGA2017-034 | CEMENT MASON/CONCRETE FINISHER | $10.00 | $0.00 |
| ELEC0175-003 | ELECTRICIAN | $35.35 | $14.63 |
| IRON0387-002 | IRONWORKERORNAMENTAL | $32.00 | $15.05 |
| IRON0704-002 | IRONWORKER, REINFORCING | $31.00 | $18.87 |
| IRON0387-002 | IRONWORKER, STRUCTURAL | $32.00 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $15.05 |
| SUGA2017-034 | LABORERPIPELAYER | $12.55 | $1.90 |
| SUGA2017-034 | LABORERCOMMON OR GENERAL | $13.72 | $5.40 |
| ENGI0926-005 | OPERATORCRANE | $38.53 | $16.08 |
| ENGI0926-006 | OPERATORFORKLIFT | $32.93 | $16.08 |
| SUGA2017-034 | OPERATORGRADER/BLADE | $16.80 | $0.00 |
| SUGA2017-034 | OPERATORROLLER | $14.05 | $0.00 |
| SUGA2017-034 | OPERATORLOADER | $14.86 | $0.00 |
| SUGA2017-034 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $19.78 | $10.28 |
| SUGA2017-034 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $14.88 | $0.00 |
| SUGA2017-034 | OPERATORBULLDOZER | $15.23 | $0.00 |
| SUGA2017-034 | PAINTERSPRAY | $16.29 | $0.00 |
| SUGA2017-034 | PAINTER(BRUSH AND ROLLER) | $16.14 | $0.00 |
| PLUM0072-006 | PIPEFITTER | $41.18 | $17.01 |
| PLUM0072-008 | PLUMBER | $41.18 | $17.01 |
| SHEE0085-023 | SHEET METAL WORKER | $38.29 | $17.40 |