Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 2 counties in Georgia: Liberty, Long. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUGA2017-015 | CARPENTER | $24.34 | $4.53 |
| SUGA2017-015 | CEMENT MASON/CONCRETE FINISHER | $21.40 | $4.25 |
| SUGA2017-015 | ELECTRICIAN | $23.67 | $8.02 |
| SUGA2017-015 | LABORERCOMMON OR GENERAL | $14.09 | $2.80 |
| SUGA2017-015 | LABORERPIPELAYER | $16.50 | $0.00 |
| SUGA2017-015 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $22.45 | $3.35 |
| SUGA2017-015 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| OPERATORBULLDOZER |
| $16.29 |
| $0.00 |
| SUGA2017-015 | OPERATORCRANE | $25.45 | $0.00 |
| SUGA2017-015 | OPERATORLOADER | $17.01 | $4.32 |
| SUGA2017-015 | OPERATORROLLER | $11.89 | $0.00 |