Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 27 counties in Georgia: Barrow, Bartow, Butts, Carroll, Cherokee, Clayton, Coweta, Dawson, Dekalb, Douglas, Fayette, Fulton and 15 more. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUGA2017-006 | CARPENTER(FORM WORK ONLY) | $19.99 | $0.00 |
| SUGA2017-006 | CARPENTER, EXCLUDES FORM WORK | $21.64 | $3.90 |
| SUGA2017-006 | CEMENT MASON/CONCRETE FINISHER | $19.02 | $3.29 |
| SUGA2017-006 | ELECTRICIAN | $28.39 | $9.15 |
| SUGA2017-006 | LABORERCOMMON OR GENERAL | $13.98 | $1.38 |
| SUGA2017-006 | LABORERPIPELAYER | $17.11 | $3.23 |
| SUGA2017-006 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE |
| $24.17 |
| $4.70 |
| SUGA2017-006 | OPERATORBULLDOZER | $16.29 | $0.00 |
| SUGA2017-006 | OPERATORCRANE | $25.45 | $0.00 |
| SUGA2017-006 | OPERATORLOADER | $17.86 | $0.65 |
| SUGA2017-006 | OPERATORROLLER | $11.89 | $0.00 |
| SUGA2017-006 | PIPEFITTER | $24.72 | $13.82 |