Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Georgia: Hall. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUGA2017-004 | CARPENTER | $21.64 | $3.90 |
| SUGA2017-004 | CEMENT MASON/CONCRETE FINISHER | $19.02 | $3.29 |
| ELEC0613-003 | ELECTRICIAN | $38.65 | $12.75 |
| SUGA2017-004 | LABORERCOMMON OR GENERAL | $13.98 | $1.38 |
| SUGA2017-004 | LABORERPIPELAYER | $17.11 | $3.23 |
| SUGA2017-004 | OPERATORROLLER | $11.89 | $0.00 |
| SUGA2017-004 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| OPERATORBACKHOE/EXCAVATOR/TRACKHOE |
| $24.17 |
| $4.70 |
| SUGA2017-004 | OPERATORBULLDOZER | $16.29 | $0.00 |
| SUGA2017-004 | OPERATORCRANE | $25.45 | $0.00 |
| SUGA2017-004 | OPERATORLOADER | $17.86 | $0.65 |