Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Georgia: Gordon. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUGA2014-012 | CARPENTER, EXCLUDES FORM WORK | $14.64 | $1.98 |
| SUGA2014-012 | CEMENT MASON/CONCRETE FINISHER | $14.89 | $1.73 |
| SUGA2014-012 | FORM WORKER | $14.38 | $1.47 |
| SUGA2014-012 | HIGHWAY/PARKING LOT STRIPINGOPERATOR (STRIPING MACHINE) | $12.17 | $1.82 |
| SUGA2014-012 | INSTALLER - GUARDRAIL | $13.50 | $0.00 |
| SUGA2014-012 | IRONWORKER, REINFORCING | $14.63 | $0.00 |
| SUGA2014-012 | IRONWORKER, STRUCTURAL | $15.53 | $0.00 |
| SUGA2014-012 | LABORERASPHALT (INCLUDES DISTRIBUTOR, RAKER, SCREED, SHOVELER, AND SPREADER) | $13.50 | $2.03 |
| SUGA2014-012 | LABORERCOMMON OR GENERAL, INCLUDES EROSION CONTROL | $11.20 | $1.02 |
| SUGA2014-012 | LABORERGRADE CHECKER | $13.12 | $0.00 |
| SUGA2014-012 | LABORERMASON TENDER - CEMENT/CONCRETE | $10.45 | $0.00 |
| SUGA2014-012 | LABORERPIPELAYER | $14.50 | $0.00 |
| SUGA2014-012 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $15.64 | $1.73 |
| SUGA2014-012 | OPERATORBROOM/SWEEPER | $13.71 | $0.00 |
| SUGA2014-012 | OPERATORBULLDOZER | $15.03 | $2.22 |
| SUGA2014-012 | OPERATORCOMPACTOR | $13.31 | $2.19 |
| SUGA2014-012 | OPERATORCONCRETE SAW | $18.74 | $1.76 |
| SUGA2014-012 | OPERATORCRANE | $21.35 | $4.08 |
| SUGA2014-012 | OPERATORDISTRIBUTOR | $17.24 | $3.99 |
| SUGA2014-012 | OPERATORGRADER/BLADE | $17.87 | $2.83 |
| SUGA2014-012 | OPERATORHYDROSEEDER | $15.82 | $0.00 |
| SUGA2014-012 | OPERATORLOADER | $14.69 | $0.00 |
| SUGA2014-012 | OPERATORMECHANIC | $16.88 | $0.00 |
| SUGA2014-012 | OPERATORMILLING MACHINE | $15.95 | $0.00 |
| SUGA2014-012 | OPERATORMILLING MACHINE GROUNDSMAN | $14.50 | $2.18 |
| SUGA2014-012 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.81 | $3.24 |
| SUGA2014-012 | OPERATORPILEDRIVER | $20.34 | $2.86 |
| SUGA2014-012 | OPERATORROLLER | $13.75 | $2.12 |
| SUGA2014-012 | OPERATORSCRAPER | $13.16 | $0.00 |
| SUGA2014-012 | OPERATORSCREED | $15.23 | $1.70 |
| SUGA2014-012 | OPERATORSHUTTLE BUGGY | $13.61 | $0.00 |
| SUGA2014-012 | TRAFFIC CONTROLFLAGGER | $13.46 | $0.00 |
| SUGA2014-012 | TRAFFIC CONTROLLABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $13.20 | $0.00 |
| SUGA2014-012 | TRAFFIC SIGNALIZATIONLABORER | $13.51 | $0.83 |
| SUGA2014-012 | TRUCK DRIVERDUMP TRUCK | $14.31 | $0.27 |
| SUGA2014-012 | TRUCK DRIVERFLATBED TRUCK | $15.42 | $2.02 |
| SUGA2014-012 | TRUCK DRIVERHYDROSEEDER TRUCK | $11.23 | $0.00 |
| SUGA2014-012 | TRUCK DRIVERLOWBOY TRUCK | $17.42 | $0.00 |
| SUGA2014-012 | TRUCK DRIVERSEMI/TRAILER TRUCK | $16.99 | $0.00 |
| SUGA2014-012 | TRUCK DRIVERWATER TRUCK | $12.82 | $0.00 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.