Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 5 counties in Georgia: Fannin, Franklin, Gilmer, Union, White. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0026-001 | BOILERMAKER | $34.21 | $23.92 |
| SUGA2012-026 | CARPENTER | $18.91 | $3.37 |
| SUGA2012-026 | CEMENT MASON/CONCRETE FINISHER | $12.89 | $0.00 |
| SUGA2012-026 | ELECTRICIAN | $23.34 | $3.70 |
| ELEV0032-005 | ELEVATOR MECHANIC(FRANKLIN, UNION, & WHITE COUNTIES) PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $52.08 | $38.44 |
| ELEV0093-004 | ELEVATOR MECHANIC |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $52.81 |
| $38.44 |
| SUGA2012-026 | IRONWORKER, REINFORCING | $17.72 | $0.00 |
| SUGA2012-026 | IRONWORKER, STRUCTURAL | $16.75 | $0.00 |
| SUGA2012-026 | LABORERCOMMON OR GENERAL | $11.46 | $0.00 |
| SUGA2012-026 | LABORERPIPELAYER | $15.50 | $0.00 |
| ENGI0926-034 | OPERATORCRANE | $38.53 | $16.08 |
| SUGA2012-026 | OPERATORBACKHOE/EXCAVATOR | $14.00 | $0.00 |
| SUGA2012-026 | OPERATOROILER | $12.00 | $0.00 |
| SUGA2012-026 | PAINTERBRUSH, ROLLER AND SPRAY | $14.77 | $0.27 |
| PLUM0072-024 | PIPEFITTER(INCLUDING INSTALLATION OF HVAC PIPE, HVAC UNIT, & HVAC ELECTRICAL /TEMPERATURE CONTROLS) | $38.98 | $17.01 |
| SUGA2012-026 | PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC UNIT, AND HVAC ELECTRICAL/TEMPERATURE CONTROLS | $17.54 | $1.27 |
| SUGA2012-026 | ROOFER | $13.62 | $0.00 |
| SUGA2012-026 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $24.89 | $9.09 |
| SUGA2012-026 | SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $15.77 | $0.00 |