Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Georgia: Putnam. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0026-001 | BOILERMAKER | $34.21 | $23.92 |
| SUGA2012-016 | CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $18.00 | $0.00 |
| SUGA2012-016 | CEMENT MASON/CONCRETE FINISHER | $12.45 | $0.54 |
| SUGA2012-016 | DRYWALL HANGER, INCLUDES METAL STUD INSTALLATION | $12.00 | $0.00 |
| ELEC1316-019 | ELECTRICIAN(LOW VOLTAGE WIRING ONLY) | $32.00 | $14.71 |
| SUGA2012-016 | ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | $18.42 | $2.62 |
| ELEV0032-001 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEVATOR MECHANIC PAID HOLIDAYSA. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE |
| $52.08 |
| $38.44 |
| SUGA2012-016 | GLAZIER | $14.93 | $1.11 |
| SUGA2012-016 | IRONWORKER, REINFORCING | $17.72 | $0.00 |
| SUGA2012-016 | IRONWORKER, STRUCTURAL | $16.75 | $0.00 |
| SUGA2012-016 | LABORERPIPELAYER | $13.33 | $0.00 |
| SUGA2012-016 | LABORERCOMMON OR GENERAL | $10.51 | $0.59 |
| ENGI0926-034 | OPERATORCRANE | $38.53 | $16.08 |
| SUGA2012-016 | OPERATOROILER | $12.00 | $0.00 |
| SUGA2012-016 | OPERATORBACKHOE/EXCAVATOR | $15.50 | $0.65 |
| PAIN0193-001 | PAINTERBRUSH, ROLLER, SPRAY | $26.00 | $14.90 |
| PLUM0072-022 | PIPEFITTER(INCLUDING HVAC PIPE AND HVAC UNIT INSTALLATION) | $41.18 | $17.01 |
| PLUM0072-023 | PLUMBER | $38.98 | $17.01 |
| SUGA2012-016 | ROOFER | $13.62 | $0.00 |
| SHEE0085-012 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $37.75 | $17.95 |
| SUGA2012-016 | SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $18.91 | $0.00 |
| SUGA2012-016 | SPRINKLER FITTER(FIRE SPRINKLERS) | $18.81 | $1.44 |