Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 3 counties in Georgia: Floyd, Murray, Whitfield. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUGA2008-109 | BRICKLAYER | $13.83 | $0.00 |
| SUGA2008-109 | CARPENTER | $13.11 | $1.89 |
| SUGA2008-109 | CEMENT MASON/CONCRETE FINISHER | $13.02 | $3.52 |
| SUGA2008-109 | ELECTRICIAN | $14.51 | $3.82 |
| SUGA2008-109 | LABORERMASON TENDER | $8.00 | $0.00 |
| SUGA2008-109 | LABORERCOMMON OR GENERAL | $10.00 | $0.00 |
| ENGI0926-009 | OPERATING ENGINEERSBACKHOE, COMPACTOR, AND LOADER | $28.32 | $13.45 |
| SUGA2008-109 | OPERATORBULLDOZER | $13.66 | $3.05 |
| SUGA2008-109 | OPERATOREXCAVATOR | $8.96 | $0.00 |
| PAIN0193-006 | PAINTERBRUSH, ROLLER AND SPRAY (FLOYD COUNTY) | $26.00 | $14.90 |
| PAIN0226-003 | PAINTERBRUSH, ROLLER AND SPRAY (MURRAY AND WHITFIELD COUNTIES) | $25.85 | $12.74 |
| SUGA2008-109 | PLUMBER | $10.86 | $0.00 |
| SUGA2008-109 | ROOFER | $9.47 | $0.00 |
| SHEE0085-004 | SHEET METAL WORKER(BUILIDNGS OVER 100,000 SQUARE FEET) FOOTNOTE: WORK ON SWINGING STAGES, BOATSWAINS CHAIRS OR SCAFFOLDS, BOOMS, OR SCISSORS LIFTS OVER 50 FT. HIGH: $1.25 PER HOUR ADDITIONAL | $32.60 | $13.41 |
| SHEE0085-004 | SHEET METAL WORKER(BUILDINGS UP TO 100,000 SQUARE FEET) FOOTNOTE: WORK ON SWINGING STAGES, BOATSWAINS CHAIRS OR SCAFFOLDS, BOOMS, OR SCISSORS LIFTS OVER 50 FT. HIGH: $1.25 PER HOUR ADDITIONAL | $32.60 | $15.52 |
| SUGA2008-109 | TRUCK DRIVER | $12.17 | $0.83 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.