Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 4 counties in Georgia: Chattahoochee, Harris, Marion, Muscogee. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUGA2008-106 | BRICKLAYER | $13.83 | $0.00 |
| SUGA2008-106 | CARPENTER | $11.06 | $0.00 |
| SUGA2008-106 | CEMENT MASON/CONCRETE FINISHER | $13.02 | $3.52 |
| SUGA2008-106 | ELECTRICIAN | $13.77 | $0.00 |
| SUGA2008-106 | LABORERMASON TENDER | $8.00 | $0.00 |
| SUGA2008-106 | LABORERCOMMON OR GENERAL | $8.88 | $0.52 |
| ENGI0474-010 | OPERATING ENGINEERS |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $30.17 |
| $17.70 |
| ENGI0926-012 | OPERATING ENGINEERSBACKHOE, COMPACTOR, AND LOADER (HARRIS AND MUSCOGEE COUNTIES) | $28.32 | $13.45 |
| SUGA2008-106 | OPERATORBULLDOZER | $13.66 | $3.05 |
| SUGA2008-106 | OPERATOREXCAVATOR | $8.96 | $0.00 |
| SUGA2008-106 | PAINTERBRUSH, ROLLER AND SPRAY | $8.50 | $0.00 |
| SUGA2008-106 | PLUMBER | $10.86 | $0.00 |
| SUGA2008-106 | ROOFER | $9.47 | $0.00 |
| SHEE0085-004 | SHEET METAL WORKER(BUILIDNGS OVER 100,000 SQUARE FEET) FOOTNOTE: WORK ON SWINGING STAGES, BOATSWAINS CHAIRS OR SCAFFOLDS, BOOMS, OR SCISSORS LIFTS OVER 50 FT. HIGH: $1.25 PER HOUR ADDITIONAL | $32.60 | $13.41 |
| SHEE0085-004 | SHEET METAL WORKER(BUILDINGS UP TO 100,000 SQUARE FEET) FOOTNOTE: WORK ON SWINGING STAGES, BOATSWAINS CHAIRS OR SCAFFOLDS, BOOMS, OR SCISSORS LIFTS OVER 50 FT. HIGH: $1.25 PER HOUR ADDITIONAL | $32.60 | $15.52 |
| SUGA2008-106 | TRUCK DRIVER | $12.17 | $0.83 |