Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Georgia: Bibb. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUGA2008-083 | BRICKLAYER | $13.83 | $0.00 |
| SUGA2008-083 | CARPENTER, INCLUDING DRYWALL HANGING | $10.00 | $0.00 |
| SUGA2008-083 | CEMENT MASON/CONCRETE FINISHER | $13.02 | $3.52 |
| SUGA2008-083 | ELECTRICIAN | $13.77 | $0.00 |
| SUGA2008-083 | HVAC MECHANIC(INSTALLATION OF HVAC DUCT) | $11.06 | $0.00 |
| SUGA2008-083 | LABORERMASON TENDER | $8.00 | $0.00 |
| SUGA2008-083 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $7.25 |
| $0.00 |
| ENGI0926-009 | OPERATING ENGINEERSBACKHOE, COMPACTOR, AND LOADER | $28.32 | $13.45 |
| SUGA2008-083 | OPERATORBULLDOZER | $13.66 | $3.05 |
| SUGA2008-083 | OPERATOREXCAVATOR | $8.96 | $0.00 |
| SUGA2008-083 | PAINTERBRUSH, ROLLER AND SPRAY | $8.63 | $0.00 |
| SUGA2008-083 | PLUMBER | $10.86 | $0.00 |
| SUGA2008-083 | ROOFER | $9.47 | $0.00 |
| SHEE0085-005 | SHEET METAEXCLUDING HVAC DUCT INSTALLATION (BUILDINGS UP TO 100,000 SQUARE FEET) FOOTNOTE: WORK ON SWINGING STAGES, BOATSWAINS CHAIRS OR SCAFFOLDS, BOOMS, OR SCISSORS LIFTS OVER 50 FT. HIGH: $1.25 PER HOUR ADDITIONAL | $25.49 | $11.73 |
| SHEE0085-005 | SHEET METALEXCLUDING HVAC DUCT INSTALLATION: (BUILDINGS OVER 100,000 SQUARE FEET) FOOTNOTE: WORK ON SWINGING STAGES, BOATSWAINS CHAIRS OR SCAFFOLDS, BOOMS, OR SCISSORS LIFTS OVER 50 FT. HIGH: $1.25 PER HOUR ADDITIONAL | $32.60 | $15.52 |
| SUGA2008-083 | TRUCK DRIVER | $12.17 | $0.83 |