Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in Georgia: Hall. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUGA2022-002 | CARPENTER | $32.68 | $0.00 |
| SUGA2022-002 | CEMENT MASON/CONCRETE FINISHER | $29.99 | $0.00 |
| SUGA2022-002 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $16.83 | $2.23 |
| SUGA2022-002 | LABORERCOMMON OR GENERAL | $18.66 | $0.00 |
| SUGA2022-002 | LABORERPIPELAYER | $22.42 | $0.00 |
| SUGA2022-002 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $23.53 | $3.63 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUGA2022-002 |
| OPERATORBULLDOZER |
| $24.68 |
| $2.59 |
| SUGA2022-002 | OPERATORCRANE | $39.31 | $0.00 |
| SUGA2022-002 | OPERATORGRADER/BLADE | $26.18 | $4.28 |
| SUGA2022-002 | OPERATORLOADER | $22.37 | $1.40 |
| SUGA2022-002 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.62 | $4.10 |
| SUGA2022-002 | OPERATORROLLER | $18.64 | $3.99 |
| SUGA2022-002 | TRAFFIC CONTROLFLAGGER | $14.80 | $2.76 |
| SUGA2022-002 | TRUCK DRIVERDUMP TRUCK | $21.75 | $3.58 |