Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 2 counties in Florida: Flagler, Volusia. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0067-003 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 |
| SUFL2014-041 | CARPENTER | $17.92 | $0.00 |
| SUFL2014-041 | CEMENT MASON/CONCRETE FINISHER | $19.00 | $0.00 |
| ELEC0756-005 | ELECTRICIAN | $31.02 | $14.43 |
| ELEV0139-002 | ELEVATOR MECHANIC FOOTNOTEA. EMPLOYER CONTRIBUTIONS 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS LESS THAN 5 YEARS. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $53.73 | $38.44 |
| PLUM0295-005 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| HVAC MECHANICINCLUDES PIPE AND UNIT INSTALLATION |
| $33.90 |
| $15.15 |
| IRON0402-001 | IRONWORKERORNAMENTAL | $28.90 | $15.66 |
| SUFL2014-041 | IRONWORKER, REINFORCING | $22.81 | $11.58 |
| SUFL2014-041 | IRONWORKER, STRUCTURAL | $21.87 | $0.00 |
| SUFL2014-041 | LABORERPIPELAYER | $15.00 | $0.54 |
| SUFL2014-041 | LABORERMASON TENDER - CEMENT/CONCRETE | $12.00 | $0.00 |
| SUFL2014-041 | LABORERCOMMON OR GENERAL | $11.61 | $0.00 |
| ENGI0487-022 | OPERATORMECHANIC | $32.05 | $9.20 |
| ENGI0487-022 | OPERATOROILER | $23.50 | $9.20 |
| ENGI0487-022 | OPERATORFORKLIFT | $23.25 | $9.20 |
| ENGI0673-016 | OPERATORCRANE (TOWER CRANE; CRAWLER CRANE; TRUCK CRANE; HYDRO CRANE) | $36.00 | $15.10 |
| ENGI0673-016 | OPERATORCRANE (GANTRY CRANE; BRIDGE CRANE) | $36.00 | $15.10 |
| SUFL2014-041 | OPERATORGRADER/BLADE | $18.97 | $0.00 |
| SUFL2014-041 | OPERATORROLLER | $14.43 | $4.78 |
| SUFL2014-041 | OPERATORLOADER | $16.30 | $0.00 |
| SUFL2014-041 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $17.80 | $2.81 |
| SUFL2014-041 | OPERATORBULLDOZER | $15.40 | $1.90 |
| SUFL2014-041 | PAINTERBRUSH, ROLLER AND SPRAY | $13.54 | $0.00 |
| SUFL2014-041 | PIPEFITTER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $23.16 | $10.34 |
| PLUM0295-002 | PLUMBER | $41.60 | $22.68 |
| SUFL2014-041 | ROOFER | $16.59 | $0.00 |
| SHEE0015-006 | SHEET METAL WORKER(INCLUDES HVAC DUCT INSTALLATION) | $25.75 | $16.92 |
| SFFL0821-004 | SPRINKLER FITTER(FIRE SPRINKLERS) | $35.03 | $24.00 |
| SUFL2014-041 | TILE SETTER | $17.25 | $1.74 |
| SUFL2014-041 | TRUCK DRIVERDUMP TRUCK | $12.95 | $2.28 |
| SUFL2014-041 | TRUCK DRIVERLOWBOY TRUCK | $14.24 | $0.00 |