Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Florida: Hernando. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0067-003 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 |
| SUFL2014-015 | CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION(EXCLUDES CARPET AND VINYL FLOOR LAYING) | $16.94 | $3.16 |
| SUFL2014-015 | CEMENT MASON/CONCRETE FINISHER | $14.72 | $1.46 |
| SUFL2014-015 | ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $22.46 | $7.52 |
| ELEV0074-001 | ELEVATOR MECHANIC FOOTNOTEA. EMPLOYER CONTRIBUTIONS 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS LESS THAN 5 YEARS. B.PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY, THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $51.83 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $38.44 |
| SUFL2014-015 | FLOOR LAYERCARPET AND VINYL | $17.64 | $0.00 |
| SUFL2014-015 | HVAC MECHANIC(HVAC DUCT INSTALLATION ONLY) | $17.95 | $1.52 |
| IRON0402-001 | IRONWORKERORNAMENTAL | $28.90 | $15.66 |
| IRON0397-008 | IRONWORKER, REINFORCING | $35.25 | $17.32 |
| IRON0397-007 | IRONWORKER, STRUCTURAL | $35.25 | $17.32 |
| SUFL2014-015 | LABORERPIPELAYER | $14.00 | $1.40 |
| SUFL2014-015 | LABORERCOMMON OR GENERAL, INCLUDES CARPENTER TENDING AND CEMENT MASON TENDING | $11.83 | $1.59 |
| SUFL2014-015 | OPERATORBULLDOZER | $15.40 | $1.90 |
| SUFL2014-015 | OPERATORGRADER/BLADE | $18.97 | $0.00 |
| SUFL2014-015 | OPERATORLOADER | $14.00 | $1.40 |
| SUFL2014-015 | OPERATORROLLER | $14.43 | $4.78 |
| SUFL2014-015 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $22.07 | $8.80 |
| SUFL2014-015 | PAINTERBRUSH, ROLLER AND SPRAY | $14.72 | $2.13 |
| PLUM0123-002 | PIPEFITTER(INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $35.30 | $18.24 |
| PLUM0123-003 | PLUMBER | $35.30 | $18.24 |
| ENGI0487-030 | POWER EQUIPMENT OPERATORGROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $35.01 | $16.85 |
| ENGI0487-030 | POWER EQUIPMENT OPERATORGROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 |
| ENGI0487-030 | POWER EQUIPMENT OPERATORGROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES. | $38.01 | $16.85 |
| ENGI0487-030 | POWER EQUIPMENT OPERATORGROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 |
| SUFL2014-015 | ROOFER | $19.00 | $1.17 |
| SHEE0015-005 | SHEET METAL WORKER(EXCLUDES HVAC DUCT INSTALLATION) | $25.75 | $16.92 |
| SUFL2014-015 | SPRINKLER FITTER(FIRE SPRINKLERS) | $20.63 | $8.38 |
| SUFL2014-015 | TILE SETTER | $18.01 | $0.00 |
| SUFL2014-015 | TRUCK DRIVERLOWBOY TRUCK | $14.24 | $0.00 |
| SUFL2014-015 | TRUCK DRIVERDUMP TRUCK | $13.22 | $2.12 |