Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Florida: Gilchrist. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0013-001 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $28.00 | $12.30 |
| SUFL2014-013 | CARPENTER, INCLUDES FORM WORK | $15.32 | $0.00 |
| SUFL2014-013 | CEMENT MASON/CONCRETE FINISHER | $14.47 | $1.74 |
| SUFL2014-013 | ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $17.35 | $1.98 |
| ELEV0049-001 | ELEVATOR MECHANIC FOOTNOTEA. EMPLOYER CONTRIBUTIONS 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS LESS THAN 5 YEARS. B.PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY, THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $51.11 | $38.44 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRON0402-001 |
| IRONWORKERORNAMENTAL |
| $28.90 |
| $15.66 |
| SUFL2014-013 | IRONWORKER, REINFORCING | $22.81 | $11.58 |
| IRON0597-006 | IRONWORKER, STRUCTURAL | $29.50 | $12.98 |
| SUFL2014-013 | LABORERCOMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $11.65 | $0.82 |
| SUFL2014-013 | LABORERPIPELAYER | $12.49 | $1.07 |
| SUFL2014-013 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $14.44 | $1.40 |
| SUFL2014-013 | OPERATORROLLER | $14.43 | $4.78 |
| SUFL2014-013 | OPERATORLOADER | $14.83 | $1.84 |
| SUFL2014-013 | OPERATORGRADER/BLADE | $18.97 | $0.00 |
| SUFL2014-013 | OPERATORBULLDOZER | $15.40 | $1.90 |
| SUFL2014-013 | PAINTERBRUSH, ROLLER AND SPRAY | $15.62 | $2.05 |
| PLUM0234-011 | PIPEFITTER(INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $37.50 | $17.59 |
| PLUM0234-006 | PLUMBER | $37.50 | $17.59 |
| ENGI0487-030 | POWER EQUIPMENT OPERATORGROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $39.01 | $16.85 |
| ENGI0487-030 | POWER EQUIPMENT OPERATORGROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES. | $38.01 | $16.85 |
| ENGI0487-030 | POWER EQUIPMENT OPERATORGROUP 3 CRANES NOT DESCRIBED ABOVE; MECHANICS JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $37.01 | $16.85 |
| ENGI0487-030 | POWER EQUIPMENT OPERATORGROUP 4 FORKLIFT JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE | $35.01 | $16.85 |
| SUFL2014-013 | ROOFER | $16.99 | $0.00 |
| SUFL2014-013 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $20.09 | $0.30 |
| SUFL2014-013 | SPRINKLER FITTER(FIRE SPRINKLERS) | $18.51 | $6.01 |
| SUFL2014-013 | TILE SETTER | $18.01 | $0.00 |
| SUFL2014-013 | TRUCK DRIVERDUMP TRUCK | $13.22 | $2.12 |
| SUFL2014-013 | TRUCK DRIVERLOWBOY TRUCK | $14.24 | $0.00 |