Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Florida: Charlotte. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0067-003 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 |
| SUFL2014-006 | CARPENTER | $19.78 | $8.05 |
| SUFL2014-006 | CEMENT MASON/CONCRETE FINISHER | $14.85 | $0.60 |
| ELEC0915-005 | ELECTRICIAN(INCLUDES LOW VOLTAGE WIRING) | $33.11 | $14.59 |
| ELEV0074-001 | ELEVATOR MECHANIC FOOTNOTEA. EMPLOYER CONTRIBUTIONS 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS LESS THAN 5 YEARS. B.PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY, THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $51.83 | $38.44 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRON0402-001 | IRONWORKERORNAMENTAL | $28.90 | $15.66 |
| SUFL2014-006 | IRONWORKER, REINFORCING | $26.37 | $12.65 |
| IRON0397-007 | IRONWORKER, STRUCTURAL | $35.25 | $17.32 |
| SUFL2014-006 | LABORERCOMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $13.00 | $0.00 |
| SUFL2014-006 | LABORERPIPELAYER | $14.00 | $1.40 |
| ENGI0487-023 | OPERATORCRANE (ALL CRANES OVER 300 TON, ELECTRIC TOWER, LUFFING BOOM CRANES) | $40.40 | $14.90 |
| ENGI0487-023 | OPERATORCRANE (ALL CRANES 75 TONS AND BELOW) | $37.07 | $14.90 |
| ENGI0487-023 | OPERATORCRANE (CRANES 76 TON TO 129 TON) | $37.57 | $14.90 |
| ENGI0487-023 | OPERATORCRANE (CRANES 130-300 TON) | $39.38 | $14.90 |
| ENGI0487-029 | OPERATORMECHANIC | $37.07 | $14.90 |
| ENGI0487-029 | OPERATORFORKLIFT | $26.75 | $14.90 |
| ENGI0487-029 | OPERATOROILER | $27.53 | $14.90 |
| SUFL2014-006 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $22.07 | $8.80 |
| SUFL2014-006 | OPERATORBULLDOZER | $15.40 | $1.90 |
| SUFL2014-006 | OPERATORGRADER/BLADE | $18.97 | $0.00 |
| SUFL2014-006 | OPERATORLOADER | $14.00 | $1.40 |
| SUFL2014-006 | OPERATORROLLER | $14.43 | $4.78 |
| SUFL2014-006 | PAINTERBRUSH, ROLLER AND SPRAY | $14.72 | $2.13 |
| SUFL2014-006 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $20.59 | $7.49 |
| SUFL2014-006 | PLUMBER | $21.14 | $8.11 |
| SUFL2014-006 | ROOFER | $19.00 | $1.17 |
| SUFL2014-006 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $19.05 | $4.47 |
| SUFL2014-006 | SPRINKLER FITTER(FIRE SPRINKLERS) | $21.86 | $7.94 |
| SUFL2014-006 | TILE SETTER | $18.01 | $0.00 |
| SUFL2014-006 | TRUCK DRIVERDUMP TRUCK | $13.22 | $2.12 |
| SUFL2014-006 | TRUCK DRIVERLOWBOY TRUCK | $14.24 | $0.00 |