Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Florida: Brevard. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0067-003 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.12 | $13.11 |
| SUFL2014-004 | CARPENTER, INCLUDES FORM WORK | $19.33 | $2.73 |
| SUFL2014-004 | CEMENT MASON/CONCRETE FINISHER | $19.27 | $0.00 |
| SUFL2014-004 | ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $17.38 | $4.46 |
| ELEV0139-002 | ELEVATOR MECHANIC FOOTNOTEA. EMPLOYER CONTRIBUTIONS 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; EMPLOYER CONTRIBUTIONS 6% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS LESS THAN 5 YEARS. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $53.73 | $38.44 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRON0402-001 |
| IRONWORKERORNAMENTAL |
| $28.90 |
| $15.66 |
| SUFL2014-004 | IRONWORKER, REINFORCING | $22.81 | $11.58 |
| SUFL2014-004 | IRONWORKER, STRUCTURAL | $19.80 | $0.00 |
| SUFL2014-004 | LABORERPIPELAYER | $15.00 | $0.54 |
| SUFL2014-004 | LABORERCOMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $12.07 | $1.81 |
| ENGI0487-022 | OPERATORMECHANIC | $32.05 | $9.20 |
| ENGI0487-022 | OPERATORFORKLIFT | $23.25 | $9.20 |
| ENGI0487-022 | OPERATOROILER | $23.50 | $9.20 |
| ENGI0673-016 | OPERATORCRANE (GANTRY CRANE; BRIDGE CRANE) | $36.00 | $15.10 |
| ENGI0673-016 | OPERATORCRANE (TOWER CRANE; CRAWLER CRANE; TRUCK CRANE; HYDRO CRANE) | $36.00 | $15.10 |
| SUFL2014-004 | OPERATORLOADER | $17.83 | $0.00 |
| SUFL2014-004 | OPERATORROLLER | $14.43 | $4.78 |
| SUFL2014-004 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $19.00 | $3.43 |
| SUFL2014-004 | OPERATORBULLDOZER | $15.40 | $1.90 |
| SUFL2014-004 | OPERATORGRADER/BLADE | $18.97 | $0.00 |
| SUFL2014-004 | PAINTERBRUSH, ROLLER AND SPRAY | $13.22 | $0.00 |
| PLUM0295-004 | PIPEFITTER(INCLUDES HVAC PIPE AND UNIT INSTALLATION) | $41.60 | $22.68 |
| SUFL2014-004 | PLUMBER | $23.88 | $5.69 |
| SUFL2014-004 | ROOFER | $17.60 | $1.39 |
| SUFL2014-004 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $23.50 | $0.57 |
| SFFL0821-004 | SPRINKLER FITTER(FIRE SPRINKLERS) | $35.03 | $24.00 |
| SUFL2014-004 | TILE SETTER | $17.25 | $1.74 |
| SUFL2014-004 | TRUCK DRIVERDUMP TRUCK | $12.95 | $2.28 |
| SUFL2014-004 | TRUCK DRIVERLOWBOY TRUCK | $14.24 | $0.00 |